My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-10-01 NE 174th Tree Removal and Relocation
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2014 9:56:29 AM
Creation date
12/4/2014 9:49:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree Name DBH” <br />174th Street Tree Relocation Bid Form <br />Item <br />Number DispositionSpread / Ft.Ht./ft.New Location Relocation Cost <br />10-1-2014The City Of Sunny Isles, Florida <br />Project Phase <br />Sabal Palm 10011 Relocate810 Samson Park Dunes $1 Subtotal (174th St. Right of Way Improvements): <br />Sabal Palm 10012 Relocate810 Samson Park Dunes $1 Subtotal (174th St. Right of Way Improvements): <br />Sabal Palm 10013 Relocate820 Samson Park Dunes $1 Subtotal (174th St. Right of Way Improvements): <br />Sabal Palm 10014 Remove812 $1 Subtotal (174th St. Right of Way Improvements): <br />Sabal Palm 10015 Relocate820 Samson Park Dunes $1 Subtotal (174th St. Right of Way Improvements): <br />Silver Buttonwood Tree 4016 Relocate1424 Gwen Margolis Park $1 Subtotal (174th St. Right of Way Improvements): <br />Silver Buttonwood Tree 18017 Relocate1420 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Silver Buttonwood Tree 4018 Remove1810 $1 Subtotal (174th St. Right of Way Improvements): <br />Vietchii Palm Triple 12019 Relocate1810 Gwen Margolis Park $1 Subtotal (174th St. Right of Way Improvements): <br />Vietchii Palm Triple 12020 Relocate810 Gwen Margolis Park $1 Subtotal (174th St. Right of Way Improvements): <br />2Page of 16 <br />BID NOTE <br />THE PROPOSAL WILL INCLUDE ALL NECESSARY LABOR FOR THE RELOCATION OF THE LANDSCAPE ITEMS <br />DESCRIBED HERE TO “RELOCATE” TO LOCATIONS WITHIN THE CITY AND NOTED ABOVE. THE CONTRACTOR <br />SHALL COORDINATE THE RELOCATIONS WITH THE CITY PRIOR TO COMMENCEMENT. <br />THE CONTRACTOR WILL BID ALL ITEMS LISTED HEREIN ON A UNIT COST BASIS AND THAT UNIT COST IS <br />TO INCLUDE THE COST OF ALL LABOR, SOIL AMMENDMENTS, EQUIPMENT COSTS AND PROFIT . ALL PERMITS WILL BE <br />INCLUDED AND PAID FOR BY THE CONTRACTOR. <br />James Santiago <br />Landscape Architect <br />305-791-3156 <br />Total Relocation Project Price
The URL can be used to link to this page
Your browser does not support the video tag.