Laserfiche WebLink
Tree Name DBH” <br />174th Street Tree Relocation Bid Form <br />Item <br />Number DispositionSpread / Ft.Ht./ft.New Location Relocation Cost <br />10-1-2014The City Of Sunny Isles, Florida <br />Project Phase <br />Temporary irrigation, all sites2002 $7 Bid Subtotal (Items 2000-2003) <br />10% Overall Project <br />Contingency <br />2003 $7 Bid Subtotal (Items 2000-2003) <br />Subtotal Project Cost $Bid Subtotal (Items 2000-2003) <br />Bid Total $Project Grand Total <br />16Page of 16 <br />BID NOTE <br />THE PROPOSAL WILL INCLUDE ALL NECESSARY LABOR FOR THE RELOCATION OF THE LANDSCAPE ITEMS <br />DESCRIBED HERE TO “RELOCATE” TO LOCATIONS WITHIN THE CITY AND NOTED ABOVE. THE CONTRACTOR <br />SHALL COORDINATE THE RELOCATIONS WITH THE CITY PRIOR TO COMMENCEMENT. <br />THE CONTRACTOR WILL BID ALL ITEMS LISTED HEREIN ON A UNIT COST BASIS AND THAT UNIT COST IS <br />TO INCLUDE THE COST OF ALL LABOR, SOIL AMMENDMENTS, EQUIPMENT COSTS AND PROFIT . ALL PERMITS WILL BE <br />INCLUDED AND PAID FOR BY THE CONTRACTOR. <br />James Santiago <br />Landscape Architect <br />305-791-3156 <br />Total Relocation Project Price