Laserfiche WebLink
Work Authorization No. 171 <br />Octobcr 9, 2014 <br />Calvin, Giordano & Associates, Inc., Proposal No. 14- 7122.1 <br />CITY OF SUNNY ISLES BEACH <br />WORK AUTHORIZATION ESTIMATE DATE October 9, 2014 <br />WORK AUTHORIZATION NO. <br />PROJECT NAME <br />DESCRIPTION <br />ESTIMATED DESIGN TIME <br />ESTIMATED CONSTRUCTION TIME <br />ESTIMATED CONSTRUCTION COST <br />171 <br />Emergency Seawall Repair, Design, <br />Permitting & Inspection <br />Repair, Design, Permitting & Inspection <br />0 <br />0 <br />50.00 <br />TITLE ' " <br />RATE" <br />-HOURS <br />COST <br />Associate Construction <br />$165.00 <br />3 <br />S495.00 <br />Clerical <br />$75.00 <br />25 <br />51.875.00 <br />Construction Management Director <br />S135.00 <br />77 <br />$10,395.00 <br />Engineer ll <br />S105.00 <br />116 <br />S12,180.00 <br />Environmental Administrator <br />S125.00 <br />130 <br />S16,250.00 <br />Environmental Specialist <br />S105.00 <br />16 <br />S1,680.00 <br />Project Engineer III <br />S125.00 <br />152 <br />S19,000.00 <br />Project Manager IV <br />S145.00 <br />158 <br />522,910.00 <br />Sr Inspector <br />$100.00 <br />285 <br />$28,500.00 <br />B- CONSULTANTS.._ <br />TOTAL <br />Reviewed by: <br />Bill Evans, Assistant City Manager <br />S113,285.00 <br />S113,285.00 <br />