My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3867
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:03:58 AM
Creation date
9/19/2025 11:05:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3867
Date (mm/dd/yyyy)
08/21/2025
Description
Approving 1st Amnd to Project Agrmnt w/ Keith & Associates, Inc d/b/a Keith, for Civil Engineering & Landscape Architectural Svcs for Bella Vista Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 The City's review of any documents prepared by the Consultant or its subconsultants <br />shall be solely for the purpose of determining whether such documents are generally <br />consistent with the City's construction program and intent. No review of such <br />documents shall relieve the Consultant of its responsibility for the accuracy, adequacy, <br />fitness, suitability and coordination of its work product. <br />SECTION 4 CONSTRUCTION COSTS <br />4.1 If the cost of construction exceeds the cost agreed upon by the City by more than 5% <br />of the lowest bona fide bid or negotiated proposal, the City may (1) give written <br />approval of an increase in such fixed limit, (2) authorize rebidding or renegotiating of <br />the Project, (3) terminate the Project and this Agreement in accordance herewith, or (4) <br />cooperate in revising the Project scope or quality, or both, as required to reduce the <br />construction cost. In the case of (4), the Consultant, without additional charge to the <br />City, shall consult with the City and shall revise and modify the drawings and <br />specifications as necessary to achieve compliance with the cost agreed upon by the <br />City. Absent negligence on the part of the Consultant in making its estimates of probable <br />construction cost, providing such modifications and revisions shall be the limit of the <br />Consultant's responsibility arising from the establishment of such construction costs, <br />and having done so, the Consultant shall be entitled to compensation for all other <br />services performed, in accordance with this Agreement. <br />SECTION 5 BASIS OF COMPENSATION <br />5.1 The City shall compensate the Consultant for an amount not to exceed $103,145.00, which <br />amount was previously approved by the City Commission in Resolution Nos. 2022-3334, <br />2022-3444, and 2024-3635, based on services rendered pursuant to Sections 2.3 through <br />2.5 and EXHIBIT "1," Scope of Services. Billings for each phase shall not exceed the <br />amount allocated to each phase. <br />5.2 Payment to the Consultant of the sum set forth in Section 5.1 shall be allocated for work <br />completed for each of the following tasks: <br />Task 104 — Sketch & Description (SSL Lease) ............................................ $3,500.00 <br />Task 402 — Engineering Construction Documents ....................................... $2,400.00 <br />Task 403 — Engineering Permitting.............................................................. $6,500.00 <br />Task 702 — Landscape Construction Documents .......................................... $2,200.00 <br />Task 703 — Seawall Design Coordination..................................................... $2,000.00 <br />Task 801— Civil/Landscape Bidding Assistance .......................................... $3,200.00 <br />Task 802 — Civil Const. Observation & Cert. Services .............................. $12,500.00 <br />Task 803 — Landscape Const. Observation Services .................................... $6,500.00 <br />Task 501 — Electrical Construction Documents ............................................ $2,680.00 <br />Task 502 - Electrical Construction Services ................................................. $2,500.00 <br />Page 6 of 12 <br />378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.