June 25, 2025 / Page 3 of 4 <br />Bella Vista Park / Project #11723.04 <br />City of Sunny Isles Beach <br />Contract Addendum # 05 <br />CIVIL ENGINEERING SERVICES <br />Task 404 Additional Engineering Permitting <br />KEITH, upon further coordination with FDOT is required to prepare and submit the permit applications <br />for the construction of the following improvements and process them through the following regulatory <br />agencies (not included in the original contract): <br />Paving, Grading, and Drainage System <br />• Florida Department of Transportation — Access Permit <br />• Florida Department of Transportation — Drainage Permit <br />Deliverables <br />1. Permit applications and submittal documents required for above listed regulatory agencies for <br />the listed project improvements. <br />SCHEDULE <br />SURVEY SERVICES <br />Task 105 Specific Purpose Survey 3-4 weeks <br />SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES <br />Task 205 Horizontal Designation Services <br />2-3 weeks <br />Task 206 Location Services <br />3-4 weeks <br />Task 207 Utility Mapping <br />3-4 weeks <br />CIVIL ENGINEERING SERVICES <br />Task 404 Additional Engineering Permitting <br />3-4 months <br />0 Engineering Inspired Design. <br />