My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azur Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(25-08-01) Temporary Holiday Themed Experience
>
Responses
>
AZUR GROUP
>
Azur Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 4:14:39 PM
Creation date
9/23/2025 4:09:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Winterland <br />VILLAGES <br />Temporary Holiday Themed Exp. RFP No. 25-08-01 <br />1.3 TECHNICAL METHODOLOGY & APPROACHES <br />METHODOLOGY OF ASSEMBLY <br /> 1. Arrival of the rink and all orther elements ne cessary for the <br /> Winterland Village of Sunny Isles Beach. <br /> 2. Connect the chiller. <br /> 3. Set up the icemats and collectors. <br /> 4. Install icemats. <br /> 5. Setup an initial pressure of 2.5 bar for icemat control. <br /> 6. Check the icemat pressure. <br /> 7. Fill the water circuit by covering open buffers with ethylene glycol. <br /> (food grade) from tanks.. <br /> 8. Start the chiller and get the temperature down to 6.8° <br /> 9. Commission and start water to create the ice. <br />10. Fit the railing. <br />11. Ensure levels of ice thickness. <br />12. Design the City of Sunny Isles Beach logo in the ice. <br />13. Build ice until ready for skating. <br />14. Finalize and implement a site safety zones. <br />15. Open the Village & enjoy Skating on the ice. <br />METHODOLOGY OF INTERVENTION FOR DISASSEMBLY <br /> 1. Starting the day after operations ceased, we turn off all equipment. <br /> 2. Melt the ice. <br /> 3. Recover all ethylene glycol (food grade) in tanks. <br /> 4. Remove guardrails. <br /> 5. Dismantle track and collectors. <br /> 6. Repack all the equipment. <br /> 7. Load and departure site until next year. <br />* The chiller can be delivered ahead of this schedule if needed. <br />** While operating, we have teams on call 24/7 ready to act if necessary. <br />*** Installation of equipment supervised by three (3) technicians. <br />**** Eight (8) people during three (3) days are needed to install. <br />***** Eight (8) people during two (2) days are needed to install. <br />20
The URL can be used to link to this page
Your browser does not support the video tag.