My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dock and Marine Construction Corp
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Dock and Marine Construction Corp - NON-RESPONSIVE
>
Dock and Marine Construction Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:08:06 PM
Creation date
10/7/2025 12:07:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #ITEM TOTAL <br />1 F&I Vertical Piles 24 EA $5,600.00 <br />2 F&I Batter Piles 22 EA $5,600.00 <br />3 Removal of Rip Rap 1 LS ----------------- <br />4 Repalcement of Rip Rap 1 LS --------------- <br />5 Turbidity Barrier 300 LF $42 <br />$314,200 <br />ITEM #ITEM TOTAL <br />6 F&I Seawall panels 22 EA $7,400 <br />$162,800 <br />ITEM #ITEM TOTAL <br />7 Removal 1 LS ---------------- <br />8 Replacement 1 LS ---------------- <br />9 Remove 2" Electrical Conduits and Services 6 EA $1,400 <br />10 Reconnect 2" Electrical Conduits and Service 6 EA $1,600 <br />11 Removal 2" and Replacement of Water Service to Dock 1 LS ---------------- <br />$51,600 <br />ITEM #ITEM TOTAL <br />12 Form and Pour Cap 185 LF $450 <br />13 Backfill 1 LS $100 <br />$$108,250 <br />ITEM #ITEM TOTAL <br />14 Signage 1 LS --------------- <br />15 Restoration 1 LS ------------------ <br />16 Security Gate 1 EA $24,418 <br />17 Cable Railing 75 LF $320 <br />18 Wood Deck 1 LS ---------------- <br />$155,668 <br />ITEM #ITEM TOTAL <br />19 Mobilization 1 LS ----------------- <br />20 Maintenance of Traffic 1 LS ---------------------- <br />21 Construction Surveying/As-builts 1 LS ----------------- <br />22 Construction Testing 1 LS --------------- <br />23 Overhead and Profit 1 LS ------------------- <br />24 Bonds & Insurance 1 LS ------------------ <br />25 Permit Fee 1 LS BY OWNER <br />$111,016.54 <br />$903,534.54 <br />26 Additionl riprap will be placed as needed to achieve the required 2:1 Slope 1 CY $125 <br />$903,534.54Grand-Total with Other Items: <br />Grand-Total 1 - 25: <br />OTHER ITEMS TBD <br />Included in Pricing <br />$26,316.54 <br />TBD <br />General Conditions Subtotal <br />QTY UNIT UNIT COST <br />$68,000 <br />$3,200 <br />$5,000 <br />$8,500 <br />$24,000 <br />$105,500 <br />Miscellaneous Subtotal <br />GENERAL CONDITIONS <br />Miscellaneous <br />QTY UNIT UNIT COST <br />$1,750 <br />$ <br />$24,418 <br />QTY UNIT UNIT COST <br />$83,250 <br />$25,000 <br />Seawall Cap Subtotal <br />$9,600 <br />$1,600 <br />Docks Subtotal <br />Seawall Cap- Ann Estimated 2 Cubic Yards of fill per linear foot will be required to support the new sewall and cap, achieving a finshed elevation of 7.25 NGVD <br />DOCKS <br />QTY UNIT UNIT COST <br />$12,000 <br />$20,000 <br />$8,400 <br />PANELS <br />QTY UNIT UNIT COST <br />$162,800 <br />Panels Subtotal <br />$20,000 <br />$24,000 <br />$12,600 <br />Piles Subtotal <br />ITB # 25-04-01 Bella Vista Park Seawall Construction <br />SCHEDULE OF VALUES <br />PILES <br />QTY UNIT UNIT COST <br />$134,000 <br />$123,200
The URL can be used to link to this page
Your browser does not support the video tag.