My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dock and Marine Construction Corp
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-04-01) Bella Vista Seawall Replacement
>
Responses
>
Dock and Marine Construction Corp - NON-RESPONSIVE
>
Dock and Marine Construction Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:08:06 PM
Creation date
10/7/2025 12:07:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />CLIENT: <br />KEITH AND <br />ASSOCIATES, INC. <br />CB <br />ADDRESS: <br />301 E ATLANTIC BLVD <br />POMPANO BEACH, FL 33060 <br />ENGINEER: <br />CUMMINS CEDERBERG <br />COASTAL & MARINE ENGINEERING <br />201 ALHAMBRA CIRCLE, SUITE 601 <br />CORAL GABLES, FL 33134 <br />TEL: +1 305 741-6155 FAX: +1 305-974-1969 <br />WWW.CUMMINSCEDERBERG.COM <br />COA # 29062 <br />UNK <br />CB <br />SEAL: <br />5.4 <br />5 " VINYL SHEATHED EAW STEEL CABLE (9800 <br />LBS. BREAKING STRENGTH) WITH GALVANIZED <br />CONNECTORS (TOOL FREE DISCONNECT) <br />ANCHOR TO BULKHEAD, TYP. <br /> <br /> <br /> <br /> <br />STRESS PLATE <br /> <br /> <br /> <br /> <br /> <br />5 16" GALVANIZED <br />CHAIN MHW MHW MHW 5.55 PERMIT DRAWINGS SUBMISSION / REVISION 10/31/2024 DATE ISSUE
The URL can be used to link to this page
Your browser does not support the video tag.