Laserfiche WebLink
ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />1 F&I Vertical Piles 24 EA $ <br />2 F&I Batter Piles 22 EA $ <br />3 Removal of Rip Rap 1 LS $ <br />4 Repalcement of Rip Rap 1 LS $ <br />5 Turbidity Barrier 300 LF $ <br />$ <br />ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />6 F&I Seawall panels 22 EA $ <br />$ <br />ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />7 Removal 1 LS $ <br />8 Replacement 1 LS $ <br />9 Remove 2" Electrical Conduits and Services 6 EA $ <br />10 Reconnect 2" Electrical Conduits and Service 6 EA $ <br />11 Removal 2" and Replacement of Water Service to Dock 1 LS $ <br />$ <br />ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />12 Form and Pour Cap 185 LF $ <br />13 Backfill 1 LS $ <br />$ <br />ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />14 Signage 1 LS $ <br />15 Restoration 1 LS $ <br />16 Security Gate 1 EA $ <br />17 Cable Railing 75 LF $ <br />18 Wood Deck 1 LS $ <br />$ <br />ITEM #ITEM QTY UNIT UNIT COST TOTAL <br />19 Mobilization 1 LS $ <br />20 Maintenance of Traffic 1 LS $ <br />21 Construction Surveying/As-builts 1 LS $ <br />22 Construction Testing 1 LS $ <br />23 Overhead and Profit 1 LS $ <br />24 Bonds & Insurance 1 LS $ <br />25 Permit Fee 1 LS BY OWNER $ <br />$ <br />$ <br />$ <br />ITB # 25-04-01 Bella Vista Park Seawall Construction <br />Grand-Total 1 - 25: <br />PILES <br />SCHEDULE OF VALUES <br />Piles Subtotal <br />General Conditions Subtotal <br />Grand-Total with Other Items: <br />OTHER ITEMS <br />GENERAL CONDITIONS <br />PANELS <br />Miscellaneous Subtotal <br />Seawall Cap Subtotal <br />Docks Subtotal <br />Panels Subtotal <br />Miscellaneous <br />SEAWALL CAP <br />DOCKS