My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3913
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 10:43:05 AM
Creation date
10/23/2025 9:29:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3913
Date (mm/dd/yyyy)
10/16/2025
Description
1st Amendment to Agrment w/ Keith & Associates to provide landscape architectural svcs on an as-needed basis
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32.3 As full compensation for such suspension, the Consultant shall be reimbursed for the <br />following costs, reasonably incurred, without duplication of any item, to the Pxtant that <br />such costs directly result from such suspension of work: <br />A. An equitable amount to reimburse the Consultant for the cost of maintaining and <br />protecting that portion of the services which have been suspended; and <br />B. If, as a result of any such suspension of services, the cost to the Consultant of <br />subsequently performing services is increased or decreased, an equitable <br />adjustment will be made in the cost of performing the remaining portion of services, <br />SECTION 33 RECORD DRAWINGS AND SPECIFICATIONS <br />33,1 During coatstruction, the Consultant shall maintain for the City a record of deviations on <br />the basis of information compiled and furnished, in pail, by others, from thework as shown <br />in the drawings and specifications atid as actually installed. Before final payment by the <br />City, the Consultant shall revise any drawings and speci I ications affected by such deviation <br />so that all such docornents shall show the work actually installed- A digital drawing or <br />approved equal of the final certified record drawings shall be submitted to the City, <br />312 A review of the markup record drawings at the construction site will be conducted at the <br />progress meeting. <br />SECTION 34 ORDEit OF PRECEDENCE <br />34.1 In the event of an inconsistency between provisions of this Agreement, the inconsistency <br />shall be resolved in the following order: <br />A, Project Agreement or Letter Agreement <br />B. Continuing Services Agreement <br />C. RFQ, including all addenda <br />D. Response to RFQ <br />SECTION35 SUCCESSORS AND ASSIGNS <br />35.1 The City and Consultant bind themselves, their successors, assigns, and legal <br />representatives to the other party hereto and to successors, assigns and legal representatives <br />of sut:h other party in respect to covenants, agreements, and obligations contained in this <br />Agreement, The Consultant shall not assign this Agreement without prior written consent <br />of the. City. <br />SECTION 36 CONSUINANI''S PERSONNEL <br />36.1 The presence or duties of the Consultant's personnel at a work site, whether as onsite <br />representatives or otherwise, do not make the Consultant or the Consultant's personnel in <br />any way responsible for those duties that belong to the City andlor the construction <br />contractors or other entities, :and do not relieve the construction contractors or any other <br />entity of their obligatioom,, duties, and responsibilities, including, but not limited to, all <br />Authorized City Representative's Initials: / '4 Authorized Consultant Representative's InlGals.&/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.