Laserfiche WebLink
Line Items PAY ITEM NO.DESCRIPTION UNIT UNIT COST QUANTITY EXTENDED COST <br />1 630 2 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 52 <br />2 632 7 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1 <br />3 635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 3 <br />4 646 1 11 ALUMINUM SIGNALS POLE, PEDESTAL EA 3 <br />5 650 1 18 VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 5 SECTION STRAIGHT, 1 WAY AS 1 <br />6 650 1 60 VEHICULAR TRAFFIC SIGNAL, REMOVE- POLES TO REMAIN AS 2 <br />7 650 1 70 VEHICULAR TRAFFIC SIGNAL, RELOCATE- INCLUDES REMOVAL ANDREINSTALLATION AS 1 <br />8 653 1 11 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY AS 2 <br />9 653 1 12 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 2 WAY AS 2 <br />10 665 1 11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD EA 8 <br />11 700 1 111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESSTHAN 12 SF EA 1 <br />12 700 1 600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE EA 1 <br />13 700 141903 ENHANCED HIGHWAY SIGN ASSEMBLY, AC POWERED, REMOVE - OVERHEAD MOUNT EA 1 <br />14 711 11 141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10GAP EXTENSION, 6"GM 0.020 <br />15 711 11 170 THERMOPLASTIC, STANDARD, WHITE, ARROW EA 4 <br />$ <br />16 GENERAL CONDITIONS <br />17 0101 1 MOBILIZATION <br />18 INSURANCE AND LICENSES <br />19 102.1 MOT <br />20 MOBILIZATION <br />21 DEMOBILIZATION <br />22 BOND <br />23 PERMIT FEES LS 10,000.00 1 $10,000.00 <br />GRAND TOTAL 1 - 23 <br />CONSTRUCTION BID SHEET ITB 25-09-01 183RD STREET AND COLLINS AVENUE LEFT CONVERSION <br />SUB-TOTAL 1 - 15 <br />ROADWAY