City o f Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />4.2.1 In addition to the Contract Price set forth in Paragraph 4.1.1, there shall be a <br />contingency in the amount of Nine Thousand Nine Hundred Fifty Dollars and No Cents <br />($9,950.00). The contingency accounts for all labor, materials, equipment, overhead, and <br />services necessary for modification or extra work required to complete the Work because <br />of unforeseen conditions, unforeseen conflicts between existing elements of work and the <br />proposed work; for minor changes required to resolve any unforeseen conditions, Revised <br />Regulations, Technological and Products Development, Operational Changes, Schedule <br />Requirements, Program Interface, Emergencies, and Other Miscellaneous Costs, and for <br />adjustments to estimated quantities installed, and associated time related to the Work. <br />Unforeseen conditions or conflicts as used in this Paragraph 4.2.1, are those conditions <br />which could not have been determined or ascertained from a thorough and careful <br />examination and inspection of the site as provided by Paragraph 1.5.8. The disbursement <br />of all or part of the contingency is entirely at the discretion of the City and must be <br />authorized by the City's Representative and approved by the City. <br />ARTICLE V <br />PAYMENT OF THIS; CONTRACT PRICE <br />5.1 Schedule of Values <br />5.1.1 At least seven (7) days before the first Pre -Construction Meeting, the <br />Contractor shall submit to the City and to the City's Representative a Schedule of Values <br />allocating the Contract Price to the various portions of the Work in conformance to the <br />revised bid form submitted by Contractor in response to the ITB. The Schedule of Values <br />shall be used only as a basis for the Contractor's Applications for Payment and shall only <br />constitute such basis after it has been acknowledged in writing by the City's Representative <br />and the City. <br />5.2 Payment Procedure <br />5.2.1 The City shall pay the Contract Price to the Contractor as provided below. <br />5.2.2 Progress Pa ments. Based upon the Contractor's Payment Requests to the <br />City's Representative and upon Certificates for Payment subsequently issued to the City <br />by the City's Representative, the City shall make progress payments to the Contractor on <br />account of the Contract Price. Contractor shall use the AIA G-702 / 703 payment submittal <br />method. <br />5.2.3 On or before the 25th day of each month after commencement of the Work, <br />the Contractor shall submit a Payment Request for the period ending the last day of the <br />previous month to the City Representative in such forth and manner, and with such <br />supporting data and content, as the City or the City Representative may require. <br />Contemporaneously with the submission of each Application for Payment, the Contractor <br />shall submit a current shop drawing log reflecting the status of all shop drawings and <br />submittals; a current CPM schedule as required by Paragraph 7.9 herein below; lien <br />copies of releases from Contractor and releases from subcontractors in favor of <br />Contractor's Surety confirming receipt of funds received from the City for the previous <br />payment period; and the Contractor shall have a current set of As -Built drawings <br />AUM CONSTRUCTION, INC. 8 <br />