Laserfiche WebLink
City of Sunny .Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-31 l3 Fax <br />Thereupon, the City's Representative will make final inspection of the Work and, if the <br />Work is complete in full accordance with the Contract Documents and this Contract has <br />been fully performed, the City's Representative will promptly issue a final Certificate for <br />Payment certifying to the City that the Project is complete and the Contractor is entitled <br />to the remainder of the unpaid Contract Price, less any amount withheld pursuant to this <br />Contract. If the City's Representative is unable to issue its final Certificate for Payment <br />and is required to repeat its final inspection of the Work due to deficient work by <br />Contractor or any party retained by the Contractor to perform work or supply materials <br />under the Agreement, the Contractor shall bear the cost of such repeat final inspection(s) <br />which cost may be deducted by the City from the Contractor's final payment. <br />5.4.2 As a condition precedent to final payment to the Contractor, the Contractor <br />shall deliver to the City the following documents in a form acceptable to the City: <br />a) Project Record Documents including As -built Drawings and Specifications, Addenda, <br />Construction Schedule, Change Orders, and other modifications of the Contract, <br />Approved Shop Drawings, Product Data and Samples, and Field Test records. <br />b) Operating and Maintenance Instructions: Submit instructions and/or manuals for <br />operating equipment and systems as prepared in accordance with the requirements of <br />the applicable equipment specifications sections. <br />c) Warranties and Bonds: As applicable and in accordance with the requirements of the <br />individual sections of the specifications. <br />d) Affidavit that all payrolls, invoices for materials and equipment, and other liabilities <br />connected with the Work for which the City, or the City's property might be <br />responsible, have been fully paid or otherwise satisfied. <br />e) Lien releases and waivers of payment bond claims from all Subcontractors and <br />releases from the Contractor to the City as required by the City's Representative or <br />the City. <br />f) Consent of surety to final payment. <br />g) A duly executed assignment of any and all warranties required by the Contract <br />Documents. <br />h) Any and all operating manuals required by the Contract Documents. <br />i) Any and all manuals relating to Project materials or Project maintenance. <br />j) Executed change orders relating to any and all changes in the Work. <br />k) Any and all as -built drawings required by the Contract Documents. <br />If any third party fails or refuses to provide a release of claim or waiver of lien as required <br />by the City, the Contractor shall furnish a Consent of Surety to the City and to discharge <br />any such lien or indemnify the City from liability. <br />5.4.3 As a further condition precedent to final payment, the Contractor shall furnish <br />to the City a complete and comprehensive set of as -built drawings; said as -built drawings <br />are to be submitted in hard copy and in electronic format, and the City and the Contractor <br />agree and acknowledge that the Contract Price includes all cost and expense associated <br />with the production of said as -built drawings. <br />AUM CONSTRUCTION, INC. I 1 <br />