My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3934
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2025 3:38:02 PM
Creation date
12/22/2025 12:12:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3934
Date (mm/dd/yyyy)
11/20/2025
Description
AWD ITB No. 25-09-01, & approve Agrmnt w/ AUM Construction, Inc for the 183rd St. & Collins Ave left turn conversion project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City gf'Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />6.3 City's Right to Perform Work <br />6.3.1 If the Contractor's Work is stopped by the City under Paragraph 6.2, or if <br />the Contractor persistently fails or refuses to perform the Work in accordance with this <br />Contract, and the Contractor fails within three (3) days of such stoppage, failure, or refusal, <br />to provide adequate assurance to the City that the cause of such stoppage will be <br />eliminated or corrected, then the City may, without prejudice to any other rights or <br />remedies the City may have against the Contractor, proceed to carry out the subject Work, <br />In such , a situation, an appropriate Change Order shall be issued deducting from the <br />Contract Price the cost of correcting the subject deficiencies, plus compensation for the <br />City's Representative's additional services, if any, and expenses necessitated thereby, if <br />any. If the unpaid portion of the Contract Price is insufficient to cover the amount due the <br />City, the Contractor shall pay the difference to the City. <br />6.4 Inspections <br />6.4.1 No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer/Architect <br />or any agent of the City, to condemn any defective work or material shall not release <br />the Contractor from its obligations to install the Work free from faults and defects and to <br />promptly remove and repair any defective or deficient work. The Contractor hereby <br />acknowledges and agrees that no inspector shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any substitute <br />materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or Contractor's <br />superintendent; <br />(c) Expedite the Work for the Contractor; <br />(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically called <br />for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in connection <br />with the Work. Provided however, this shall not preclude the City inspector from notifying <br />the Contractor of any hazardous or dangerous condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Coordination and Scheduling of Work <br />6.5.1 The Contractor shall cooperate with the City and any separate contractors <br />retained by the City, and the Contractor shall carefully coordinate and schedule the Work <br />as may be required to accommodate without delay or interference the Work of the City or <br />any of its separate contractors. <br />AUM CONSTRUCTION, INC. 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.