Laserfiche WebLink
City of Sanity Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Name <br />Function <br />Aldo Apollini Project Manager <br />Humberto Ortiz President, Principal in Charge <br />The Contractor shall furnish to the City complete resumes of each of the individuals <br />named above. So long as the individuals named above remain actively employed or <br />retained by the Contractor, they shall perform the functions indicated next to their names <br />unless the City agrees to the contrary in writing or unless the City requests the removal of <br />any such individual from the Project. In the event the City requests the removal of any of <br />the individuals named above, the Contractor shall immediately comply and shall <br />immediately replace such individual with a qualified substitute to whom the City makes <br />no objection. In the event one or more individuals not listed above subsequently <br />assumes one or more of those functions listed above, the Contractor shall be bound by <br />the provisions ofthis Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8 Prior to the commencement of any construction activity, the Contractor shall <br />provide to the City the layout, right of way designation, and work area parameters for the Work. <br />7.9 The Contractor, within fifteen (15) days of commencing the Work, shall submit to the <br />City and the City's Representative for their information, the Contractor's schedule for <br />completing the Work. The Contractor's schedule shall be presented in the critical path (CPM) <br />format. The Contractor's schedule shall be revised no less frequently than monthly (unless the <br />parties otherwise agree in writing) and shall be revised to reflect conditions encountered from time <br />to time and shall be related to the entire Project. Each such revision shall be furnished to the <br />City and the City's Representative with each Application for Payment. Failure by the Contractor <br />to strictly comply with the provisions of this Paragraph 7.9 shall constitute a material breach of <br />this Contract. <br />7.10 The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the City's Representative one record <br />copy of this Contract and all Contract Documents marked to record on a current basis changes, <br />selections and modifications made during construction. Additionally, the Contractor shall <br />maintain at the site for the City and the City's Representative the approved Shop Drawings, <br />Product Data, Samples, As -Builds and other similar required submittals. Upon final completion <br />of the Work, all of these record documents shall be delivered to the City. <br />7.10.1 No less than bi-weekly, the Contractor shall conduct a Project meeting <br />which shall include the Contractor's administrative, managerial, and supervisory personnel <br />and representatives of each subcontractor working on the Project site. The meeting shall <br />address, but shall not be limited to, the current status of the Work, including the current <br />Project schedule and the existence of any defective or deficient work as well as the <br />appropriate action required to correct or replace such work. The City and the City's <br />Representative shall have the right, but not the duty, to attend such weekly meetings. The <br />Contractor shall maintain detailed minutes of each such weekly meetings and shall <br />distribute typewritten copies of such minutes to the City and the City's Representative no <br />later than the close of the next workday following completion of such meeting. The <br />AUM CONSTRUCTION, INC. 16 <br />