City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />nm <br />result of extended response time due to excessive pricing submittal by the <br />Contractor. <br />10.3.3 The value of any change ordered under the Contract for extra work or <br />any reductions in work required, shall be determined under one or more of the following <br />procedures before a written change order is issued. <br />10.3.3.1 By Unit Price named in the contract or subsequently agreed upon <br />by the City and the Contractor, which prices shall include Contractor's <br />overhead and profit. <br />10.3.3.2 By Lump Sum Price agreed upon by the City and the Contractor, <br />which price shall include overhead and profit. A breakdown of the estimated <br />costs comprising the lump sum price may be required by the City's <br />Representative for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead <br />and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added <br />percentage, all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a)Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for <br />the Work shall be just and fully compensated for by adding an amount equal to <br />FIVE PERCENT (5%) of the sum of material and labor costs as defined under <br />Subcontractor's profit below, but excluding documented equipment rental costs. <br />(b) Subcontractor's profit may then be added to the above material costs <br />and labor costs including the Overhead allowance at the rate of SEVEN <br />PERCENT (7%) of the sum of those costs, excluding equipment rental costs. <br />(c) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools incidental to and required for the Work <br />accomplished by its own direct Iabor shall be considered to be just and fully <br />compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools and equipment incidental to and required <br />for the Work accomplished by subcontractors shall be considered to be just and <br />fully compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />AUM CONSTRUCTION, INC. 26 <br />