My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3917
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 10:51:01 AM
Creation date
1/8/2026 10:51:00 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3917
Date (mm/dd/yyyy)
10/16/2025
Description
Awd ITB 25-04-01; Agmt w/ YC Group, LLC for Bella Vista Park (BVP) Seawall Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any delays, hindrances, interferences, or other problems encountered or incurred on the Project <br />site. Each week the Contractor shall furnish to the City and the Engineer / Architect on a weekly <br />basis full and complete copies of said daily job diary. <br />7.10 Shop Drawings, Product Data and Samples <br />7.10.1. Shop Drawings, Product Data, Samples and other submittals from the Contractor do <br />not constitute Contract Documents. Their purpose is merely to demonstrate the manner in which <br />the Contractor intends to implement the Work in conformance with information received from the <br />Contract Documents. <br />7.10.2. The Contractor shall not perform any portion of the Work requiring submittal and <br />review of Shop Drawings, Product Data or Samples unless and until such submittals shall have been <br />approved by the Engineer / Architect. Approval by the Engineer / Architect, however, shall not be <br />evidence that Work installed pursuant thereto conforms with the requirements of this Contract. <br />7.10.3. The Contractor shall maintain a log of all Shop Drawings, Product Data and Samples <br />submitted to the Engineer / Architect and the City including, but not limited to, identification of the <br />item of work according to appropriate specification section; date of receipt from appropriate <br />subcontractor or supplier; date of review by the Contractor; date of submission to the Engineer / <br />Architect date of return from the Engineer / Architect date of return to the subcontractor or <br />supplier status of review by the Engineer / Architect and any required re -submittal information. A <br />true and correct copy of this log shall be submitted with each Application for Payment and receipt <br />of same by the Engineer / Architect shall be a condition precedent for approval of the Application <br />for Payment. <br />7.11 Cleaning the Site and the Proiect <br />7.11.1. The Contractor shall keep the site reasonably clean during performance of the Work, <br />shall remove debris, trash and garbage from the Site daily and allow no accumulation of debris, <br />garbage or trash on the Site. Upon Final Completion of the Work, the Contractor shall clean the site <br />and the Project and remove all waste, together with all of the Contractor's property therefrom. <br />7.12 Access to Work <br />7.12.1. The City, the Engineer / Architect and the Building Department shall have access to <br />the Work at all times from commencement of the Work through Final Completion. The Contractor <br />shall take whatever steps necessary to provide access when requested. <br />7.13 Safety <br />7.13.1. The Contractor shall take all reasonable precautions for safety of, and shall provide <br />reasonable protection to prevent damage, injury or loss to, its employees on the Work and all other <br />persons who may be affected thereby; the Work and materials and equipment to be incorporated <br />therein; and all other property at the site or adjacent thereto including, but not limited to, trees, <br />shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, <br />Page 17 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.