My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3917
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 10:51:01 AM
Creation date
1/8/2026 10:51:00 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3917
Date (mm/dd/yyyy)
10/16/2025
Description
Awd ITB 25-04-01; Agmt w/ YC Group, LLC for Bella Vista Park (BVP) Seawall Replacement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
use or occupancy of the Work and can utilize the Work for its intended purpose. A condition <br />precedent for the achievement of Substantial Completion is the receipt by the City of any and all <br />Certificates of Occupancy or other authorizations required for occupancy by any governmental or <br />regulatory authority. <br />3.4 Time is of the Essence <br />3.4.1. All limitations of time set forth in the Contract Documents are of the essence of this <br />Contract. <br />ARTICLE IV <br />CONTRACT PRICE <br />4.1 The Contract Price <br />4.1.1. The City shall pay, and the Contractor shall accept, as full and complete payment for <br />all of the Work required herein, the fixed sum of Nine Hundred Ninety -Five Thousand Two <br />Hundred Thirty -Two Dollars and Thirty -One Cents ($995,232.31), plus Ninety -Nine Thousand Five <br />Hundred Twenty -Three Dollars and Twenty -Three Cents ($99,523.23) for contingency, if <br />necessary,resulting in a total not -to -exceed amount of One Million Ninety -Four Thousand Seven <br />Hundred Fifty -Five Dollars and Fifty -Four Cents ($1,094,755.54). The sum set forth in this <br />Paragraph 4.1.1 shall constitute the Contract Price which shall not be modified except by Change <br />Order as provided in this Contract. <br />4.2 Unit Prices <br />42.1. In the event all, or any portion of, the Contract Price is to be determined by the <br />application of unit prices, the following terms and conditions are applicable and controlling: <br />(a) Payment to the Contractor shall be determined by the actual number of units <br />incorporated in, or made necessary, by the Work; <br />(b) Payment to the Contractor shall be made at the Contract Unit Prices <br />applicable to each integral part of the Contract. The Contract Unit Prices shall <br />be full compensation for all costs associated with completion of all unit price <br />work in full conformity with the requirements of the Contract Documents; <br />(c) Where the quantity of Work with respect to any item that is covered by a <br />Contract Unit Price is increased or decreased by more than twenty percent <br />(20%) from the quantity of such Work indicated or estimated in the Contract <br />Documents, an appropriate Change Order shall be issued to adjust the <br />Contract Unit Price, if warranted and justified, and if fully supported by <br />documentation submitted to the City and the Engineer / Architect and if a <br />Page 7 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.