Laserfiche WebLink
12/12/2014 Item Cwersheet <br />and improving ventilation in stair cases 4 and 5. Included in the overall cost <br />for this project is an allowance for a full roof evaluation for both City Hall <br />and Commission Chambers that will be the basis for possible future roof <br />repair projects. The work will be paid for by using unit costs per the Means <br />Construction Cost Data with an approved multiplier by field measured <br />quantities. Work will be paid for on an as- measured basis with a Not to <br />Exceed budget of 52,200,000.00. <br />FUNDING SOURCE: <br />300 -5- 5390 - 462000 -30001 <br />Item Number: 10.D. <br />httpllsumiosles_ o agwda.com /CwerSheet.aspx ?Item I0=1518 22 <br />