Laserfiche WebLink
ITEM <br />NO <br />DESCRIPTION <br />QTY <br />UNIT <br />PRICE <br />EXTENDED <br />PRICE <br />18. <br />Clearing & Grubbing <br />1 <br />LS /AC <br />$2,300.00 <br />$2,300.00 <br />19. <br />Sawcut, grind and remove existing concrete <br />pavement <br />1 <br />SY <br />837.00 <br />$37.00 <br />20 <br />Milling Existing Asphalt Pavement - consists of <br />removing existing AC pavement. Includes <br />transportation of milled material and removal of <br />existing reflective pavement markers. <br />1 <br />1 <br />1 <br />SY <br />SY <br />SY <br />$35.00 <br />$35.00 <br />a. 1'AvDepth <br />b. 2° Av Depth <br />$41.00. <br />$41.00 <br />$46.00 <br />c. 3° Av Depth <br />P <br />$46.00 <br />21. <br />Removal of existing Architectural pavers <br />1 <br />SY <br />$50.00 <br />$50.00 <br />22. <br />- - <br />Regular Excavation - consists of excavation, <br />hauling and disposal of rods, day, muck of other <br />unsuitable material <br />1 <br />Cy <br />$67.00 <br />$67.00 <br />subtotal Group I - MOT, Erosion Control and Earthwork <br />$6,294.00 <br />II. Group II - Restoration <br />A. Non - Emergency (Max. response time 3 Business Days) <br />23. <br />Importation and installation of dean fill <br />1 <br />CY <br />$45.00 <br />$45.00 <br />24. <br />Flrnvable Fill <br />1 <br />CY <br />$220.00 <br />$220.00 <br />25. <br />Gravel / Ughtweight aggregate fill <br />1 <br />CY <br />$27.00 <br />$27.00 <br />26. <br />Mason Sand <br />1 <br />CY <br />37.00 <br />37.00 <br />27 <br />Umerodk base, FDOT Group 6, grading, <br />compaction @98% modified proctor <br />1 <br />1 <br />SY <br />SY <br />$42.00 <br />$48.00 <br />$42.00 <br />$48.00 <br />a. 8" thick <br />b. 12" thick <br />28. <br />Superpave Asphaltic Concrete (Type SP -9.5) <br />1 <br />1 <br />1 <br />_._.._....... <br />SY <br />SY <br />SY <br />a. 1° thick overlay <br />y <br />b. 2" thick with 2 equal lifts <br />$36.00 <br />$42.00 <br />$36.00 <br />$42.00 <br />c. 3" thick with 2 equal lifts <br />$47.00 <br />$47.00 <br />29. <br />Subgrade, grading, compaction, stabilization <br />@95% modified proctor (12" thick) @ 2 -6" lifts, <br />with commercial stabilizing material meeting the <br />requirements of FDOT specification for road bed <br />construction <br />1 <br />SY <br />$60.00 <br />$60.00 <br />City of Sunny Isles Beach I Invitation to Bid No. 14 -10 -02 <br />