My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2353
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:16:13 PM
Creation date
12/30/2014 3:20:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2353
Date (mm/dd/yyyy)
12/18/2014
Description
Public School Concurrency Prop. Share Mitigation Dev. Agmt w/School & PMG-S2.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the School District of twenty -two (22) elementary school seats, resulting in nineteen (19) <br />seats in excess of the three (3) seats needed to be mitigated by the Applicant. As such. the <br />Applicant has the right to transfer the excess nineteen (19) seats ( "Capacity Credits`-) to <br />future residential developments, as set forth in this Agreement. In order for the School <br />District to manage and transfer Capacity Credits for the Applicant, a mitigation bank <br />shall be established in connection with this Development Proposal (" Nlitigation Bank') <br />for the School Project. The School District shall create and administer the Mitigation <br />Bank as follows: <br />a. Monetary Proportionate Share Dtitiaation Cost. The Monetary <br />Proportionate Share Mitigation amount of Four Hundred Ninety Seven <br />Thousand One Hundred Fifty Six Dollars (5497,156) is the cost of the <br />Monetary Proportionate Share Mitigation option selected by the Applicant, <br />and is derived by multiplying the total number of student stations to be <br />constructed (22 seats), by the student station cost of 522,598.00, which is the <br />construction cost projected by the Florida Department of Education to be in <br />place at the time of construction of the School Project (October 2017) (i.e.22 <br />student stations x S22,598.00 cost per station = S497.156.00). In this <br />Agreement, "student station' and "seat" shall be used interchangeably unless <br />otherwise specified. <br />b. Number of Banked Seats. The number of Banked Seats shall be <br />established by determining the excess number of school seats, if any, resulting <br />from construction of the School Project (-'Banked Seats'), to wit: the number <br />of seats to be constructed (22), less the number of seats needed to be mitigated <br />SCHOOL BOARD /Proportionate Share Mitigation Agreement for Muse (SP3114053000892) Page 7 of 26 <br />Revised 12 -02 -2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.