My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-3971
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-3971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:28:10 PM
Creation date
3/9/2026 10:24:20 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-3971
Date (mm/dd/yyyy)
02/19/2026
Description
1st Amendment to Agreement w/ Neon Signs Solutions, Inc for removal, fabrication, & installation of Monument signs throughout the City.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Fees <br />19 480.00 <br />9,120.00 <br />Design Permit Drawings <br />Labor <br />1 10,000.00 <br />10,000.00 <br />Mobilization <br />Permit process <br />1 9,000.00 <br />9,000.00 <br />Permit Processing <br />Inspections <br />1 8,500.00 <br />8,500.00 <br />Obtain final inspections <br />Permit process <br />1 9,000.00 <br />9,000.00 <br />FDOT permit process <br />City fees <br />1 10,000.00 <br />10,000.00 <br />FDOT Permit Fees. <br />City fees <br />1 <br />0.00 <br />City permit fees will be paid by the City. <br />City MOT costs for police patrol will be <br />paid by the City. <br />Note: Additional charges may apply <br />depending on the ROW permit requirements. <br />Final designs in scale must be provide by <br />the City. <br />We only run up to 5' of electric. <br />Deposit will be required as follows: <br />- No deposit to initiate the project. <br />William Lehman Causeway (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs ate installed. <br />Island Median Welcome Signs (2) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Sunny Isles Blvd. Sign (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Government Center Monument (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.