My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4001
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 9:00:08 AM
Creation date
3/30/2026 5:03:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4001
Date (mm/dd/yyyy)
03/19/2026
Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Contractor shall also be entitled to an equitable adjustment to the Contract Price for additional <br />costs incurred as a result of such delay, including extended general conditions and documented <br />increases in the cost of materials or equipment attributable to such delay. <br />8.4 Field Orders <br />8.4.1. The Engineer / Architect after first obtaining approval from the City, shall have <br />authority to order minor changes in the Work not involving a change in the Contract Price or in <br />Contract Time and not inconsistent with the intent of the Contract. Such changes shall be affected <br />by Field Order and shall be binding upon the Contractor. The Contractor shall carry out such Field <br />Orders promptly. <br />ARTICLE IX <br />SUBCONTRACTORS <br />9.1 Definition <br />9.1.1. A Subcontractor is an entity that has a direct contract with the Contractor to perform <br />a portion of the Work. <br />9.2 Award of Subcontracts <br />9.2.1. Upon execution of the Contract, or as may be required by the Instructions to Bidders, <br />the Contractor shall furnish the City, in writing, the names of persons or entities proposed by the <br />Contractor to act as a Subcontractor on the Project. The City shall promptly reply to the Contractor, <br />in writing, stating any objections the City may have to such proposed Subcontractor. The Contractor <br />shall not enter into a Subcontract with a proposed Subcontractor with reference to whom the City <br />has made timely objection. The Contractor shall not be required to Subcontract with any party to <br />whom the Contractor has objection. <br />9.2.2. All subcontracts shall afford the Contractor rights against the Subcontractor which <br />correspond to those rights afforded to the City against the Contractor herein, including those rights <br />afforded to the City by Subparagraph 12.2.1 below. <br />ARTICLE X <br />CHANGES IN WORK <br />10.1 Changes Permitted <br />10.1.1. Changes in the Work within the general scope of this Contract, consisting of <br />additions, deletions, revisions, or any combination thereof, may be ordered without invalidating <br />this Contract, by Change Order, Construction Change Directive or by Field Order. <br />10.1.2. Changes in the Work shall be performed under applicable provisions of this Contract <br />and the Contractor shall proceed promptly with such changes. <br />Page 23 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.