Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the basis for pricing. Downtime due to repairs, maintenance and weather delays will not be <br />allowed. <br />10.4 Minor Changes <br />10.4.1. The Engineer / Architect, after first obtaining express written approval from the City, <br />shall have authority to order minor changes in the Work not involving a change in the Contract <br />Price or an extension of the Contract Time and not inconsistent with the intent of this Contract. <br />Such minor changes shall be made by written Field Order, and shall be binding upon the City and <br />the Contractor. The Contractor shall promptly carry out such written Field Orders. <br />10.5 Effect of Executed Change Order <br />10.5.1. The execution of a Change Order by the Contractor shall constitute conclusive <br />evidence of the Contractor's agreement to the ordered changes in the Work, this Contract as thus <br />amended, the Contract Price and the Contract Time. The Contractor, by executing the Change <br />Order, waives and forever releases any claim against the City for additional time or compensation <br />for matters relating to or arising out of or resulting from the Work included within or affected by <br />the executed Change Order. <br />10.6 Notice to Suretv: Consent <br />10.6.1. As a condition precedent for the certification, approval or payment of any <br />Application for Payment, or as a condition precedent for the approval or execution by the City of <br />any Change Order, or as a condition precedent for any action required by the City under this <br />Contract, the City may demand, and the Contractor shall furnish, an appropriately executed <br />Consent of Surety in such form as the City may specify. <br />10.7 Emergency Change Orders <br />10.7.1. In an emergency that presents immediate danger to person or property, the City's <br />designated representative may order a change in the Work that shall be documented within three <br />(3) days from the inception of said emergency in accordance with the change order requirements <br />of Article X of this Contract. <br />10.8 Construction Change Directive <br />10.8.1. If the City and the Contractor cannot agree on the cost of a change in the Work, the <br />City may issue a written Construction Change Directive ordering a change in the Work prior to <br />reaching agreement with the Contractor on the adjustment, if any, in the Contract Price and/or the <br />Contract Time. <br />10.8.2. The City and the Contractor shall negotiate expeditiously and in good faith for <br />appropriate adjustments, as applicable, to the Contract Price and/or the Contract Time arising out <br />of a Construction Change Directive. Within 15 days of issuance of the Construction Change <br />Directive, the City will issue a Change Order based upon the Engineer / Architect's estimate for the <br />cost of the Work and any additional agreed upon time extension in accordance with Article 10.3. <br />Page 27 of 44 <br />