My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4001
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2026 9:00:08 AM
Creation date
3/30/2026 5:03:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4001
Date (mm/dd/yyyy)
03/19/2026
Description
Approving Agreement w/ SHIFF Construction & Development, Inc., for Gateway Pedestrian Bridge Elevator Enclosures Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O� SUNNY IS,- <br />m <br />u ' x <br />O F <br />1f 'FF�• FLOo'� O54 <br />�tf Oi SUN � <br />CONSTRUCTION CONTRACT BETWEEN THE CITY OF SUNNY ISLES <br />BEACH AND SHIFF CONSTRUCTION & DEVELOPMENT, INC. <br />CONTRACT NO. 2026-5142 <br />THIS CONTRACT is made and entered into this 24th day of March 2026 by and <br />between CITY OF SUNNY ISLES BEACH, a municipal corporation of the State of Florida, whose <br />address is 18070 Collins Avenue sunny Isles Beach, Florida 33160 (hereinafter referred to as "the <br />City") and SHIFF CONSTRUCTION & DEVELOPMENT, INC., a Florida Corporation, whose Federal <br />Employer Identification (FEI) No. is 20-2918602 (hereinafter referred to as the "Contractor"). The <br />City and the Contractor hereby agree as follows: <br />WHEREAS, the City is in need of a Contractor to provide construction services for the <br />Gateway pedestrian bridge elevator enclosures, as more particularly described in the Contract <br />Documents, which are -incorporated herein by reference and made a part hereof (hereinafter <br />referred to as the "Project" or the "Work"); and <br />WHEREAS, the Broward Sheriff's Office ("BSO") issued Request for Letter of Interest ("RLI") <br />No. 19031MFW, entitled "General Contractors Pre -Qualified List" for pre -qualified general <br />contractors, and as a result, on or about December 18, 2019, BSO entered into a contract with <br />Contractor, as a pre -qualified general contractor, effective from January 1, 2020 through <br />December 31, 2022, incorporated herein by reference and made a part hereof as Exhibit "A," with <br />available renewal terms, which have been"exercised via a Fourth Amendment through December <br />31, 2028; and <br />WHEREAS, two quotes were received from BSO's pre -qualified list of general contractors, <br />and Contractor was determined to be the lowest responsible and responsive bid; <br />WHEREAS, Contractor is a certified and insured company with the necessary experience to <br />provide the desired Work; and <br />WHEREAS, the City wishes to enter into an agreement with Contractor, using BSO's RLI <br />solicitation, and the resulting contract thereto, to provide the Work as described herein and in the <br />Contract Documents, and subject to the terms and conditions contained herein; and <br />WHEREAS, the City wishes to contract with Contractor to provide and complete the Work <br />for Two Hundred Seven Thousand Five Hundred Dollars and No Cents ($207,500.00), plus Thirty - <br />One Thousand One Hundred Twenty -Five Dollars and No Cents ($31,125.00) for contingency, if <br />necessary, resulting in a total not -to -exceed amount of Two Hundred Thirty -Eight Thousand Six <br />Hundred Twenty -Five Dollars and No Cents ($238,625.00); <br />NOW THEREFORE, in consideration of the mutual covenants contained in this Agreement <br />and other good and valuable consideration, the adequacy and receipt of which are hereby <br />acknowledged, the Parties agree as follows: <br />Page 1 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.