Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
they shall perform the functions indicated next to their names unless the City agrees to the contrary <br />in writing or unless the City requests the removal of any such individual from the Project. In the <br />event the City requests the removal of any of the individuals named above, the Contractor shall <br />immediately comply and shall immediately replace such individual with a qualified substitute to <br />whom the City makes no objection. In the event one or more individuals not listed above <br />subsequently assumes one or more of those functions listed above, the Contractor shall be bound by <br />the provisions of this Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8. The Contractor, within fifteen (15) days of commencing the Work, shall submit to the <br />City and the Engineer /Architect for their information, the Contractor's schedule for completing the <br />Work. The Contractor's schedule shall be presented in the critical path (CPM) format. The <br />Contractor's schedule shall be revised no less frequently than monthly (unless the parties otherwise <br />agree in writing) and shall be revised to reflect conditions encountered from time to time and shall <br />be related to the entire Project. Each such revision shall be furnished City and the Engineer / <br />Architect with each Application for Payment. Failure .by the Contractor to strictly comply with the <br />provisions of this Paragraph 7.8 shall constitute a material breach of this Contract. <br />7.8.1. The Contractor, within (15) days of commencing the Work shall submit to the City <br />and the Engineer / Architect for their information, an anticipated monthly draw schedule for the <br />duration of the Work. If during the course of performing the Work the Contractor anticipates a <br />substantial change in the draw schedule, the Contractor shall notify the City and the Engineer / <br />Architect within three (3) days of anticipating such change. For purposes of this paragraph, a <br />substantial change shall be any increase or decrease equaling or exceeding ten percent (10%) of any <br />anticipated monthly draw. <br />7.9. The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the Engineer / Architect one record copy <br />of this Contract and all Contract Documents marked to record on a current basis changes, selections <br />and modifications made during construction. Additionally, the Contractor shall maintain at the site <br />for the City and Engineer / Architect the approved Shop Drawings, Product Data, Samples and other <br />similar required submittals. Upon final completion of the Work, all of these record documents shall <br />be delivered to the City. <br />7.9.1. No less than weekly, the Contractor shall conduct a Project meeting which shall include the <br />Contractor's administrative, managerial and supervisory personnel and representatives of each <br />subcontractor working on the Project site. The meeting shall address, but shall not be limited to, the <br />current status of the Work, including the current Project schedule and the existence of any defective <br />or deficient work as well as the appropriate action required to correct or replace such work. The City <br />and the Engineer / Architect shall have the right, but not the duty, to attend such weekly meetings. <br />The Contractor shall maintain detailed minutes of each such weekly meetings and shall distribute <br />typewritten copies of such minutes to the City and the Engineer / Architect no later than the close of <br />the next workday following completion of such meeting. The Contractor shall further require its <br />General Superintendent to maintain a daily job diary which shall include for each work day the daily <br />weather conditions, the identity of each subcontractor working on the site, the manpower of each <br />subcontractor working on the site, the identity of all visitors to the Project site, documentary progress <br />photographs, and any and all other information reflecting any delays, hindrances, interferences, or <br />other problems encountered or incurred on the Project site. Each week the Contractor shall furnish <br />to the City and the Engineer / Architect on a weekly basis full and complete copies of said daily job <br />diary. <br />MBR CONSTRUCTION, INC. Page 15 of 41 <br />164 <br />334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.