My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE XI <br />UNCOVERING AND CORRECTING WORK <br />11.1 Uncovering Work <br />11.1.1. If any of the Work is covered contrary to the Engineer / Architect's request or to any <br />provisions of this Contract, it shall, if required by the Engineer / Architect or the City, be uncovered <br />for the Engineer / Architect inspection and shall be properly replaced at the Contractor's expense <br />without change in the Contract Time. <br />11.1.2. If any of the Work is covered in a manner not inconsistent with Subparagraph 11.1.1 <br />above, it shall, if required by the Engineer / Architect or the City, be uncovered for the inspection of <br />the Engineer / Architect or the City. If such Work conforms strictly with this Contract, costs of <br />uncovering and proper replacement shall by Change Order be charged to the City. If such Work does <br />not strictly conform with this Contract, the Contractor shall pay the costs of uncovering and proper <br />replacement. <br />11.2 Correcting Work <br />11.2.1. The Contractor shall immediately proceed to correct Work rejected by the Engineer / <br />Architect or the City as defective or failing to conform to, this Contract. The Contractor shall pay <br />all costs and expenses associated with correcting such rejected Work, including any additional <br />testing and inspections, and reimbursement to the City for the Engineer / Architect services and <br />expenses made necessary thereby. <br />11.2.2. If within one (1) year after Final Completion of the Work any of the Work is found to <br />be defective or not in accordance with this Contract, the Contractor shall correct it promptly upon <br />receipt of written notice from the City. This obligation shall survive final payment by the City and <br />termination of this Contract. With respect to Work completed after Final Completion, this one-year <br />obligation to specifically correct defective and non -conforming Work shall be extended by the period <br />of time which elapses between Final Completion and acceptance of the subject Work by the City <br />and the Engineer / Architect. <br />11.2.3. Nothing contained in this Paragraph 1 1.2 shall establish any period of limitation with <br />respect to other obligations which the Contractor has under this Contract. Establishment of the one- <br />year time period in Subparagraph 1 1.2.2 relates only to the duty of the Contractor to specifically <br />correct the Work. <br />11.3 The Citv Mav Accept Defective or Non -conforming Work <br />11.3.1. If the City chooses to accept defective or non -conforming Work, the City may do so. <br />In such event, the Contract Price shall be reduced by the greater of: (a) the reasonable cost of <br />removing and correcting the defective or non -conforming Work, and (b) the difference between the <br />fair market value of the Project as constructed and the fair market value of the Project had it not <br />been constructed in such a manner as to include defective or nonconforming Work. <br />If the remaining portion of the unpaid Contract Price, if any, is insufficient to compensate the City <br />for its acceptance of defective or non -conforming Work, the Contractor shall, upon written demand <br />MBR CONSTRUCTION, INC. Page 26 of 41 <br />175 <br />345 <br />
The URL can be used to link to this page
Your browser does not support the video tag.