My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4003
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 10:49:37 AM
Creation date
4/7/2026 1:54:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2026-4003
Date (mm/dd/yyyy)
03/19/2026
Description
1st Amnd to Agreement w/ MBR Construction, Inc., to provide addt'l time for final completion of construction services for the Intracoastal Sports Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE I <br />THE CONTRACT AND THE CONTRACT DOCUMENTS <br />1.1 The Contract <br />1.1.1. The Contract between the City and the Contractor, of which this Contract is a part, <br />consists of the Contract Documents. It shall be effective on the date this Contract is executed by the <br />last party to execute it. <br />1.2 The Contract Documents <br />1.2.1. The Contract Documents consist of this Contract, ITB No. 24-07-01, the Contractor's <br />Response thereto, and the Specifications, the Drawings, the Addenda, all Change Orders and Field <br />Orders issued hereinafter, any exhibits or attachments thereto, any other amendments hereto <br />executed by the parties hereafter, all of which are specifically incorporated herein and made a part <br />hereof. <br />Documents not enumerated in this Paragraph 1.2 or Paragraph 1.3 are not Contract Documents and <br />do not form part of this Contract. <br />1.3 Entire Agreement <br />1.3.1. This Contract, together with the Contractor's bond for the Project, constitute the <br />entire and exclusive agreement between the City and the Contractor with reference to the Project. <br />Specifically, but without limitation, this Contract supersedes all prior written or oral <br />communications, representations, and negotiations, if any, between the City and the Contractor. <br />1.4 No Privitv with Others <br />1.4.1. Nothing contained in this Contract shall create, or be interpreted to create privity or <br />any other contractual agreement between the City and any person or entity other than the Contractor. <br />1.5 Intent and Interpretation <br />1.5.1. The intent of this Contract is to require complete, correct, and timely execution of <br />the Work. Any Work that may be required, implied, or inferred by the Contract Documents, or any <br />one or more of them, as necessary to produce the intended result shall be provided by the Contractor <br />for the Contract Price. <br />1.5.2. This Contract is intended to be an integral whole and shall be interpreted as internally <br />consistent. What is required by any one Contract Document shall be considered as required by the <br />Contract. <br />1.5.3. When a word, term, or phrase is used in this Contract, it shall be interpreted or <br />construed, first, as defined herein; second, if not defined, according to its generally accepted <br />meaning in the construction industry; and third, if there is no generally accepted meaning in the <br />construction industry, according to its common and customary usage. <br />MBR CONSTRUCTION, INC. Page 2 of 41 <br />151 <br />321 <br />
The URL can be used to link to this page
Your browser does not support the video tag.