Laserfiche WebLink
CSI Number. <br />Mod U.OM ' <br />Description <br />_ <br />LineTotal <br />Engine*ering'for utilities allowance <br />4 <br />0122 20 00-0062 <br />HR <br />Engineer <br />$5,400.00' <br />City Unit Price <br />Factor <br />Total <br />Installation 40 X $135.00 X <br />1 <br />$5,400.00 <br />Subtotal for Engineering for utilities allowance: <br />$5,400.00 <br />No Category Input <br />5 <br />03 11 13 00-0005 <br />SF <br />Mat Foundation Wood Formwork <br />$4,315.89 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 660 X $5.79 X <br />1.1294 <br />$4,315.89 <br />6 <br />03 11 13 00-0005 <br />0001 MOD <br />For <1,000, Add <br />$782.67 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 660 X $1.05 X <br />1.1294. <br />$782.67 <br />7 <br />03 11 13 00-0010 <br />LF <br />>6" To 12" High Slab Edge and Block -Out Wood Formwork <br />$1,785.24 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 330 X $4.79 X <br />1.1294 <br />$1,785.24 <br />8 <br />03 21 13 00-0087 <br />LF <br />#4, Grade 40, Slab On Grade, Galvanized Steel Reinforcement Bar <br />$2,737.67 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 2400 X $1.01 X <br />1.1294 <br />$2,737.67 <br />9 <br />03 31 13 00-0005 <br />SF <br />6" 3,000 PSI Slab On Grade Concrete Slab Assembly <br />$40,963.34 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 4680 X $7.75 X <br />1.1294 <br />$40,963.34 <br />10 <br />03 31 13 00-0005 <br />0154 MOD <br />For 4,000 PSI Concrete, Add <br />$1,797.10 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 4680 X $0.34 X <br />1.1294 <br />$1,797.10 <br />11 <br />03 31 13 00-0005 <br />0159 MOD <br />For Up To 500, Add <br />$13,055.41 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 4680 X $2.47 X <br />1.1294 <br />$13,055.41 <br />12 <br />03 31 13 00-0027 <br />CY <br />Concrete Pump, Place 3,000 PSI Concrete Mat <br />$18,888.54 <br />FoundationExcludes pumping equipment. <br />Qty Unit Price <br />Factor <br />Total <br />Installation 88 X $190.05 X <br />1.1294 <br />$18,888.54 <br />13 <br />03 31 13 00-0027 <br />0031 MOD <br />For4,000 PSI Concrete, Add <br />$1,568.33 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 88 X $15.78 X <br />1.1294 <br />$1,568.33 <br />Subtotal for No Category Input: <br />$85,894.18 <br />Grand Total: $135,294.18 <br />This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal <br />total is due to rounding of the line totals and sub -totals. <br />The Percent of NPP on this Proposal: 0.00 <br />Contractor Price Proprosal Details - Category <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />2 of 2 <br />