My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Artistic Holiday Designs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 26-04-01 Citywide Holiday Lighting & Decorations
>
RESPONSES
>
RESPONSES
>
Artistic Holiday Designs
>
Artistic Holiday Designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2026 11:08:46 AM
Creation date
5/18/2026 11:06:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br /> <br />Q5. If parks are essential, is there budget flexibility to accommodate both roadway and park <br />installations? <br />A5. Budget is intended to include Group 1 at minimum, the proposer has the option to <br />include scope within their bid for Groups 2 and 3 within this budget. <br /> <br />Q6. Are there specific branding, color themes, or past design preferences the City would like <br />proposers to build upon or evolve? Are there any colors or themes the City dislikes? <br />A6. The selected Contractor shall provide holiday lighting in neutral, non-holiday specific <br />colors. <br /> <br />Q7. Can the City provide details on available power infrastructure at each installation location, <br />including any known limitations or non-powered areas? <br />A7. All locations have sufficient power, or power can be added by the City to accommodate <br />your proposed decorations, if needed. <br /> <br />Q8. For the 161 pole décor elements to be installed between the banner mast poles, could you <br />please confirm the distance between the poles? This will ensure we propose the correct size <br />décor. <br />A8. The arms can be removed. However, we have approximately 8 feet. <br />Q9. Are there coastal/environmental requirements (wind load, corrosion resistance, salt <br />exposure standards) that must be met beyond standard municipal specifications? <br />A9. Yes, the proposer must take these elements into consideration with their design. <br /> <br />Q10. Does the City track historical outage or failure issues from prior vendors that proposers <br />should proactively address? <br />A10. Yes, issues are tracked. Primarily, they are weather related. <br /> <br />Q11. For Gateway park, a Menorah is included in the 2025 decorations. Is that a City owned and <br />installed menorah, or is the contractor expected to provide and install this menorah? <br />A11. City will install menorah. <br /> <br />Q12. The RFP (Section 2.1) states the City already owns three indoor menorahs and two <br />outdoor menorahs and will install those pieces independently. Can the City confirm at which <br />specific locations the outdoor menorahs will be placed so that proposers do not inadvertently <br />include duplicate pieces in their designs? <br />A12. The outdoor menorahs will be placed alongside any Christmas trees in the design <br />proposal. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.