Laserfiche WebLink
Installation Staffing <br />Installation crews may include: <br />• Project Manager <br />• Site Supervisors <br />• Certified lift operators <br />• Lighting technicians <br />• Electrical technicians <br />• Ground support crews <br />• Traffic control personnel <br />Additional crews may be deployed simultaneously to ensure all deadlines are achieved according <br />to the City’s proposed timetable. <br />Removal Staffing <br />Removal operations will be scheduled to efficiently dismantle, inventory, transport, and store all <br />décor and lighting materials while minimizing impact to traffic and public access areas. <br />All removal operations will include: <br />• Equipment inspections <br />• Site restoration <br />• Debris cleanup <br />• Damage inspections <br />• Final City walkthroughs <br /> <br />Safety Plan <br />Safety is a top operational priority for Shadrack Productions. <br />Our comprehensive safety procedures include: <br />• Daily safety briefings <br />• OSHA-compliant practices <br />• Fall protection protocols <br />• Lift operation safety procedures <br />• Electrical lockout/tagout procedures <br />• PPE requirements for all personnel <br />• Traffic and pedestrian safety management <br />• Weather monitoring procedures <br />• Emergency response planning