My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2026-4018
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2026
>
Reso 2026-4018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 1:02:18 PM
Creation date
5/28/2026 12:52:18 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Date (mm/dd/yyyy)
05/28/2026
Supplemental fields
Comment
Per John (IT) vendor still needs to execute certain pages.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUNIFIED <br />TECHNOLOGIES8001110 <br />Phase 3.3 - Gov Center m Implementation and Cunver <br />for Access Switches <br />In this phase, the focus is on replacing the existing access switches with new 9350 and IE3300's. All <br />physical installation, rack/stack, cabling, and power work will be performed by the Client. R2 will <br />perform all configuration, routing updates, and cutover tasks remotely once the hardware is in <br />place and reachable. <br />R2 Responsibilities: <br />Pre -stage access switches <br />• Validate switch hardware, software, licenses and firmware upgrade as needed - One <br />(1) access switch (9350) and one (1) edge switch (9350) <br />• Apply base configuration (mgmt IP, hostname, SNMP, etc.) <br />• Configure Vlans, routing and ports per approved design <br />® Cutover from old access switch to new 9350 access switch <br />• Validate and test connectivity for all connected devices <br />Client Responsibilities: <br />® Perform all onsite physical tasks, including rack/stack, power, patching, grounding, and <br />cabling of the new switches <br />® Ensure the new switches are powered on, properly connected, and reachable via <br />management network before R2 begins remote work <br />® Schedule required maintenance windows and coordinate any downtime impacts with site <br />personnel <br />® Assist in onsite validation during cutover (checking devices, patching issues, link lights, etc.) <br />at R2's direction <br />* Participate in functionality testing and confirm successful operation after migration <br />Required Resources: <br />R2 lead engineer <br />Client technical representative(s) <br />Deliverables: <br />o Completed installation of the devices <br />Statement of Work page 12 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.