Laserfiche WebLink
RUNIFIED <br />TECHNOLOGIES$0911®A <br />Phase 3.8 - Heritage Park - Implementation and Cutover <br />In this phase, the focus is on replacing the existing access and edge switches with new 9000 <br />platforms and introducing Layer 3 routing at the site. All physical installation, rack/stack, cabling, <br />and power work will be performed by the Client. R2 will perform all configuration, routing <br />updates, and cutover tasks remotely once the hardware is in place and reachable. <br />R2 Responsibilities: <br />Pre -stage edge and access switches <br />• Validate switch hardware, software, licenses and firmware upgrade as needed - six <br />(6) access switches (9350) and one (1) edge switch (9350) <br />• Apply base configuration (mgmt IP, hostname, SNMP, etc.) <br />• Configure Vlans, routing and ports per approved design <br />Cutover from old edge switch to L3 capable 9350 <br />• Move gateways from core or aggregation switch up to the new site edge switch <br />• Enable BGP between new edge switch and aggregation switches; radio and fiber <br />Tune BGP to prefer fiber links over radio, use radio links as backup paths <br />• Validate and test connectivity for all connected devices <br />Cutover from old access switches to new 9350 access switches <br />• Validate and test connectivity for all connected devices <br />Client Responsibilities: <br />a Perform all onsite physical tasks, including rack/stack, power, patching, grounding, and <br />cabling of the new switches <br />Ensure the new switches are powered on, properly connected, and reachable via <br />management network before R2 begins remote work <br />* Schedule required maintenance windows and coordinate any downtime impacts with site <br />personnel <br />Assist in onsite validation during cutover (checking devices, patching issues, link lights, etc.) <br />at R2's direction <br />a Participate in functionality testing and confirm successful operation after migration <br />Required Resources: <br />R2 lead engineer <br />* Client technical representative(s) <br />Deliverables: <br />m Completed installation of the devices <br />Statement of Work page 17 of 40 <br />