|
THE BETAJONES GROUP, INC.
<br />
<br />EXPEDITING DEVELOPMENT
<br />
<br />
<br />Page 7 of 14
<br /> Municipal Project, Government Facilities: Wynwood Neighborhood Service Center
<br />o Government Building site renovation and neighborhood re-development, design, modeling,
<br />and permitting of site, accessibility, parking, drainage, community connectivity and utilities for
<br />the expansion of Miami’s Design District
<br />o Silver LEED Certification – Goal
<br />o Miami, Miami-Dade County, Florida
<br /> Municipal Project: City of Hallandale 7th Street and North Dixie Highway Drainage
<br />Improvements.
<br />o Civil Engineer of Record in the Design, Permitting and Construction of Roadway Drainage
<br />Improvements Serving NW 7th Street serving 2 City Blocks between 2nd Avenue and North
<br />Dixie Hwy.
<br />o Hallandale Beach, Broward, Florida
<br /> Disney Resort: Walt Disney World Shades of Green Resort
<br />o Civil Engineer of Record in the Hydraulic Study, Design, and Renovations of the Resort’s
<br />Entertainment Pool Area, including adjacent recreational facilities, study and modification of
<br />existing infrastructure.
<br />o Buena Vista, Orange County, Florida
<br /> Disney Property - Private Projects: Golden Oaks Drainage Improvements
<br />o Civil Engineer of Record in drainage improvements in the development of High-End Single-
<br />Family Estate in Walth Disney World and Four Seasons Property Park under Renowned
<br />Architect – Gary Hancock - Winter Park Design.
<br />o Walt Disney World Property, Orange County, Florida
<br /> Coral Glades High School Amphitheatre - Development of what will be the last Amphitheater
<br />within a public school in Broward County.
<br />o 2700 Sportsplex Dr. Coral Springs, FL 33065
<br />o Coral Springs, Broward County, Florida.
<br />o Client: Broward County Public Schools
<br />o Design and Permitting for the Development of an Amphitheatre under Broward County
<br />School Jurisdiction, including design of Stormwater Improvements, Water, Sanitary Sewer
<br />Improvements, Erosion and Sedimentation Control, Fire Truck and Loading Access
<br />Vehicular Simulation, Signage, ADA Accessibility, Roadway and Parking Lot
<br />Markings/Striping, Construction Administration and Coordination with Multiple Jurisdictional
<br />Agencies. Services included incorporating drainage improvements into the School Master
<br />Stormwater Plan permitted through the State’s South Florida Water Management Districts’
<br />Environmental Resources Master Permit.
<br />o Civil Engineering Responsibilities included Design of the following systems: Site
<br />Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection
<br />connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage
<br />System / stormwater planning, Drainage System/ Stormwater simulation modeling.
<br />Permitting of all Civil Engineering components with multiple Jurisdictional Agencies.
<br />o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all
<br />Construction Documents for Civil Components: Site Improvement / Hardscape, Marking and
<br />Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary
<br />Sewer System connections, Drainage System / stormwater planning, Drainage System/
<br />Stormwater simulation modeling, watermain extension
<br />o Construction: Cost Estimating, Inspections, and Project Management: Construction
<br />Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs,
<br />Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and
<br />provided Project Management of the entire project during the Design and Construction
<br />Phases for all Civil Engineering Components.
<br /> Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation Study
<br />o Client: Miami-Dade Parks, Recreation, and Open Spaces
<br />16 The BetaJones Group/RFQ#26-07-01
|