My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.A.P. Engineering, Inc. Bid Document (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
C.A.P. Engineering, Inc
>
C.A.P. Engineering, Inc. Bid Document (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:36:32 PM
Creation date
8/31/2026 12:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />18070Collins Ave.|Sunny IslesBeach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br /> <br />QUESTIONNAIRE <br />MUST BE INCLUDED WITH FIRM’S PROPOSAL <br />Proposer must list projects of similar project scope fulfilling the following qualification requests: <br />3. List current workload. <br />5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: <br />1. List Project Management Personnel. Personnel cannot be changed without written approval. <br />Assigned Project Manager: <br />1.2 Principal-in-Charge: Carlos A. Penin, PE <br />2. How many years has your organization been in business as a Consultant? <br />Mohan Thampi, PE/Joshua E. Midence, PE <br />4. Is the Proposer subcontracting any part of this work? If so, give details to major key sub- <br />Consultant’s name, address, phone number and type of work to be performed. Also, indicate the <br />percentage of the total work to be performed by the sub-Consultant. <br />CAP is a sole proprietorship owned by Carlos A. Penin, PE. <br />CAP's currentworkload includes the City of South Bay SW 11th Avenue <br />Roadway Reconstruction; Miami-Dade County PROS Black Point <br />Park and Marina Design; Flamingo Park Renovations Drainage <br />Design; MDAD 30-Year Recertifications; Valvoline Centers Structural <br />Assessments; Village of Biscayne Park Phase II-A CEI; and Town of <br />Medley Capital Improvement Department Staff Augmentation. <br />No,CAP is not proposing the use of any subconsultants forthis contract. <br />C.A.P. Engineering, Inc. (CAP) has been in business for 27 years. <br />104 <br />RFQ No. 26-07-01 <br />C.A.P. Engineering, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.