My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.A.P. Engineering, Inc. Bid Document (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
C.A.P. Engineering, Inc
>
C.A.P. Engineering, Inc. Bid Document (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:36:32 PM
Creation date
8/31/2026 12:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alejandro de Alba Cutino, <br />Engineer <br />Industrial Maintenance Engineer <br />Center for Genetic Engineering and Biotechnology of Cuba <br />(CIGB) <br />Havana, Cuba <br />November 2020 – January 2023 <br />- <br />- <br />- <br />Diagnosed, repaired, and maintained pumping systemsand <br />components, including performance testing and electrical <br />connections. <br />Performed preventive and corrective maintenance on <br />pharmaceutical industry machinery and completed orbital <br />and electric arc welding. <br />Read and interpreted electrical diagrams and mechanical <br />drawings and utilized AutoCAD, Inventor, SolidWorks, and <br />Aspire for mechanical design. <br />79 <br />RFQ No. 26-07-013.4 - Key Personnel Resumes <br />Q: How do the resumes of CAP's key personnel and subconsultant personnel demonstrate <br />relevant experience, training, licensure, and successful performance on similar work?RFQ No. 26-07-01 <br />C.A.P. Engineering, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.