My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.A.P. Engineering, Inc. Bid Document (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
C.A.P. Engineering, Inc
>
C.A.P. Engineering, Inc. Bid Document (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:36:32 PM
Creation date
8/31/2026 12:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />18070Collins Ave.|Sunny IslesBeach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br /> <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _C_._A_._P_._ _E_n_g__in_e_e__ri_n_g_,_ _In_c_.________________________________________ <br />City of South BayFirm giving Reference: ____________________________________ _______________________________ <br />Phone: _5_6_1_-9_9_6_-_6_7_5_1_________________________________ <br />Email: _c_a_m_e_l_l@__s_o_u_th_b__a_yc_i_ty_._c_o_m______________________ <br />1. Q: Rate the firm’s success in providing their services as it relates to the project. <br />A : Excellent. CAP Engineering consistently provided high quality professional services and successfully met <br /> the needs of the City.2. Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A : Excellent. CAP Engineering's personnel were knowledgeable, professional and highly <br />competent. <br />3. Q: Would you use them again? <br />A: Y es. we would be comfortable working with CAP for future projects. <br /> <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A : C AP engineering demonstrated a strong committment to the project and dedicated appropriate <br /> staffing levels, remained attentive to the project's requirement and priorities. <br />5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: CAP Engineering performed the required services in accordance with the agreement <br /> <br />6. Q: Is there anything else we should know, that we have not asked? <br />A: Their team communicated well, addressed prject needs in a timely manner, and maintained <br /> a collaborative approach. <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br /> <br />REFERENCE QUESTIONNAIRE <br />Name: _______________________________________ <br />Sign Name: __________________________________ <br />Title _____________________________________________ <br /> Date:___________________________________________ <br />Leondrae D. Camel City Manager <br />Aug. 10,2026 <br />RFQ No. 26-07-01RFQ No. 26-07-015.1 - Minimum Qualification Project Reference #3 <br />RFQ No. 26-07-01 <br />98
The URL can be used to link to this page
Your browser does not support the video tag.