My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group, Inc Bid Document
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CALTRAN Engineering Group, Inc
>
CALTRAN Engineering Group, Inc Bid Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:37:39 PM
Creation date
8/31/2026 12:36:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 41 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />REFERENCE QUESTIONNAIRE <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _______________________________________________________________ <br />1.Q: Rate the firm’s success in providing their services as it relates to the project. <br />A: <br />2.Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br />3.Q: Would you use them again? <br />A: <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br />5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: <br />6.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br />Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />CALTRAN Engineering Group, Inc. <br />City of Miami Gardens, FLFirm giving Reference: ____________________________________ _____________________________ <br />Phone: _______(305) 914-9113____________________ <br />Email: _______________amatos@miamigardens-fl.gov____________________________ <br />Name: __________________________________ Alexandra Matos, AICP Planning & Land Development. Chief <br />Personnel directing, supervising and performing the work are highly competent and accessible.They are responsibe and consistently provide clear support for our projects. <br />Yes, I would use them again. <br /> Caltran shows strong commitment to the projects they are assigned. They are attentive and remain consistently engaged throughout the process. <br />Caltran has been very successful in providing services as specified, including reporting datesand content requirements. Their deliverables are always timely and aligned with expectations. <br />No <br />Caltran Engineering is professional, responsive and dependable. Their success in providing services to the CIty is excellent. <br />8/5/26
The URL can be used to link to this page
Your browser does not support the video tag.