My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group, Inc Bid Document
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CALTRAN Engineering Group, Inc
>
CALTRAN Engineering Group, Inc Bid Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:37:39 PM
Creation date
8/31/2026 12:36:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 39 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />QUESTIONNAIRE <br />MUST BE INCLUDED WITH FIRM’S PROPOSAL <br />Proposer must list projects of similar project scope fulfilling the following qualification requests: <br />1. List Project Management Personnel. Personnel cannot be changed without written approval. <br />Assigned Project Manager: <br />1.2 Principal-in-Charge: <br />2. How many years has your organization been in business as a Consultant? <br />3. List current workload. <br />4.Is the Proposer subcontracting any part of this work? If so, give details to major key sub- <br />Consultant’s name, address, phone number and type of work to be performed. Also, indicate the <br />percentage of the total work to be performed by the sub-Consultant. <br />5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: <br />Juan Calderon, PE, PTOE, RSP1 <br />Juan Calderon, PE, PTOE, RSP1 <br />15 <br />No, N/A <br />Corporation, Cristina Calderon <br />These continuing contracts fluctuate by authorized task order and do not represent full-time <br />assignments. CALTRAN monitors utilization and reserves dedicated availability for the City. <br />FDOT D6 Ludlam Trail Bridges – EOR; active design <br />FDOT D4 Project Scoping, CA633 – PM; as-needed task orders <br />Miami-Dade Transit/Public Works, E19-DTPW-11 – PM; as-needed task orders <br />FDOT D6 Planning & Statistics, CAL78 – Senior Engineer; as-needed support <br />FDOT D7 Statistics Program, CAB79 – Senior Engineer; as-needed support <br />FDOT D4 Transportation Statistics, CA589 – PM; as-needed support
The URL can be used to link to this page
Your browser does not support the video tag.