|
JUAN S. CALDERON, PE, PTOE, PTP, RSP1
<br />PROJECT MANAGER
<br />PROFILE
<br />Mr. Calderon has over 29 years of experience in traffic/ transportation engineering with a Master’s
<br />Degree in Civil Engineering. Mr. Calderon has managed multiple traffic and planning engineering
<br />projects with the Florida Department of Transportation (FDOT) and multiple clients including Miami-
<br />Dade County, Broward County, cities such as Miami Gardens, Miramar, Coral Gables, Miami, Miami
<br />Beach, and private developers.
<br />KEY DESIGN PROJECTS
<br />Mr. Calderon’s design experience includes positions of Project Manager, Designer, Senior Engineer,
<br />and Engineer of Record (EOR) for roadway, signalization, signing and pavement markings Maintenance
<br />of Traffic (MOT), and lighting as part of 3R and widening/reconstruction projects.
<br />Mr. Calderon is very familiar with FDOT Standard Plans, the FDOT Design Manual (FDM), and AASHTO
<br />roadway design standards. His experience encompasses FDOT LAP projects, pavement design,
<br />drainage, specifications, variances, and utility coordination. He is also IMSA and MOT Certified.
<br />City of Sunny Isles Beach | Continuing Transportation and Traffic Engineering Services (Multiple
<br />Contracts) | 2018–Present | Project ManagerManaged and conducted multiple transportation planning,
<br />traffic operations, and safety assignments throughout the City. Projects included the A1A Pedestrian
<br />Bridge Justification Report (2018–2019), evaluating mid-block crossing activity, future build-out
<br />conditions, safety, and benefit-cost considerations; Pier Park Traffic Engineering Study (2019),
<br />analyzing parking utilization, license-plate data, and turnover; Central Island Improvements and Master
<br />Plan and Norman S. Edelcup/Sunny Isles Beach K-8 School Operating Plan (2021–2026), addressing
<br />neighborhood access, circulation, pedestrian activity, and school-zone operations; Collins Avenue at
<br />183rd Street Signal Survey and Subsurface Utility Engineering (2024); Golden Shores Speed Studies
<br />(2024); and Collins Avenue at 183rd Street Signal Design (2024–2025), including signal improvements,
<br />utility coordination, and final design.
<br />FDOT D4 |Continuing Services for Project Scoping | 2019-Present | Project Manager
<br />Scoped process support. Multiple assignments; including Enhanced Pavement Management Program
<br />with a primary objective to develop framework of reliable mechanisms to ensure and accurately identify
<br />all FDOT D4 pavement deficient segments to be assigned for scoping and gaming. Prepare scoping
<br />reports as part of future 3R (resurfacing projects), including evaluation of ADA along sidewalks and curb
<br />ramps, transit stops, signalization and stripping. Provide consulting services for LOPP and LAP
<br />segments. Coordinate Long Range Estimates (LRE) of multiple assignments Contract No. CA633, FM
<br />444449-1-32-01 Contact: Julio Boucle, P.E., AECOM, 305-562-7466, julio.boucle@aecom.com
<br />FDOT D4 | D/W Traffic Operations Safety Reviews and Studies (2020-2023) | Perform pedestrian
<br />and traffic counts and field reviews as part of crosswalk warrant analyses and traffic studies. Contract:
<br />FM No. Contact: Kimley-Horn' Ravi Wijesundera, PE, RSP; 954-535-5153; Ravi.Wijesundera@Kimley-
<br />horn.com
<br />Commodore Trail Revitalization/Master Plan (2021-2025) | CCNA City of Miami RFP-19-20-011 In
<br />charge of the traffic and safety analysis that includes an assessment of the 5-mile trail. This analysis
<br />included an evaluation of existing condition, motorized and non-motorized traffic data collection, and
<br />statistical analysis including big data, parking analysis, crashes, transit in order to develop short- and
<br />long-term solutions as part of the master plan. Among the improvements proposed included traffic
<br />calming features and reversible lanes with innovative ideas evaluated such as roundabout metering,
<br />raised intersections, woonerf urban street, and lane eliminations. Cristobal Betancourt
<br />cbetancourt@chenmoore.com Tel: 772-486-9250/Lorraine Rosado LRosadoPietri-
<br />c@miamigov.com Tel: 305-416-1448
<br />Sun Life/HARD ROCK Stadium MOT Plans (2013-2023) | Since 2013, EOR responsible for designing
<br />EDUCATION
<br />MS Civil Engineering
<br />Florida International
<br />University, 1999
<br />BS Civil Engineering
<br />University Santo Tomas,
<br />Colombia, 1997
<br />YEARS OF EXPERIENCE
<br />Total 28 years
<br />2011 - Present - CALTRAN
<br />REGISTRATIONS
<br />ƒProfessional Engineer:
<br />àFlorida No. 58569, 2002
<br />ƒProfessional Traffic
<br />Operations Engineer,
<br />No.1301, 2004
<br />ƒProfessional Transportation
<br />Planner, No. 20
<br />Road Safety Professional
<br />(RSP1)- No 176
<br />PROFICIENCIES
<br />ƒProject Management
<br />ƒIMSA Traffic Signal
<br />ƒTraffic & Safety
<br />ƒPlanning
<br />ƒTraffic & Transit
<br />ƒRoadway Design
<br />ƒCADD Platforms
<br />ƒGIS
<br />ƒSimulation
<br />
|