Laserfiche WebLink
JEANNELIA P. LIU, PE <br />SENIOR ENGINEER <br />PROFILE <br />Mrs. Liu has a wide range of experience in consulting engineering throughout her 29-year <br />career. Her experience includes over twenty years of providing project management <br />services to various planning, studies, data collection, and GIS projects. Mrs. Liu has <br />produced many scoping reports for resurfacing and reconstruction roadway projects and <br />has been involved in numerous roadway design and planning projects in FDOT. Mrs. Liu is <br />very familiar with FDOT Roadway Standards, the FDOT FDM, and AASHTO design standards <br />for roadway, signing and pavement markings, drainage, specifications, and preparing <br />exceptions and variation reports. Her experience expands to managing contracts in which all <br />modes are addressed including rail, freight and aviation related tasks. She has generally <br />participated in tasks involving freight evaluations, transit services, FTA inspections, scoping <br />reports, traffic forecasting and modeling, and public involvement. <br />KEY PROJECTS <br />Design <br />FDOT D6 | SR 985/NW 107 Ave from North of Flagler Street to North of SR 836/Dolphin <br />Expwy (2024-Present) | Mrs. Liu is serving as Engineer of Record and Project Manager. The <br />project consists of milling & resurfacing, adjusting manhole covers and utility valves, installing <br />guardrail for the rigid barrier with sloped concrete end treatment along the northbound SR <br />985/NW 107th Avenue, below the bridges of the SR 836/Dolphin Expressway, evaluating cross <br />slopes, installing hardened centerlines (traffic separators) to supplement the crosswalks at the <br />intersections of SR 985/NW 107th Avenue with NW 7th Street/Fontainebleau Blvd., updating <br />sub—standard ground mounted signs, upgrading all pavement markings, and replacing signal <br />loops damaged by milling and resurfacing operations. Contract No. CAV10, FM 452560-1-32- <br />01 Contact: Claudia Gutierrez, FDOT D6, 305-470-5268, Claudia.gutierrez@dot.state.fl.us <br />FDOT D6 | SR 90/US 41/SW 7th St from West of SW 2nd AvetoBrickell Ave (2022-Present) <br />| Mrs. Liu is serving as Engineer of Record and Project Manager. The project consists of milling <br />& resurfacing, correcting failures, adjusting manhole covers and utility valves, evaluating cross <br />slopes, extending the south median of Brickell Ave, evaluating sight distance, installing bulb- <br />outs at SW 1st Ct Ave, correcting misalignment at South Miami Ave, extending median at SW <br />2nd Ave, and coordination with the City of Miami/MDC/Underline about road realignment under <br />the Metromover. Contract No. CAL57, FM 443905-1-32-01. Contact: Mario Duran, FDOT D6, <br />305-470-5183, mario.duran@dot.state.fl.us <br />FDOT D4 | Bayview Drive from N. of SR 838/ Sunrise Blvd to S. of SR 870/ Commercial <br />Blvd (2019-2022) |Mrs. Liu served as Engineer of Record and Project Manager. The project <br />entailed adding bike lanes along southbound Bayview Drive between NE 26th Street and NE <br />25th Place, installing sidewalks where there are none along Bayview Drive from SR-838/Sunrise <br />Blvd to SR-870/Commercial Blvd, installing midblock crossings at these three locations; NE <br />12th Street, NE 15th Street and NE 27th Street and at existing signalized intersections (NE <br />19th Street and NE 45th Street), installing raised intersections along Bayview Drive where <br />feasible at NE 14th Street, NE 18th Street, NE 27th Street and NE 40th Street. Also included <br />installing roundabouts at NE 37th Drive, NE 47th Street, and the addition of a median separator <br />and modifications to the intersection of NE 28th Avenue. Reduce pedestrian crossing distance <br />at NE 13th Ct.Contract No. CA578, FM 438118-1-52-01Contact: Helen James, FDOT D4, 954- <br />777-4346, helen.james@dot.state.fl.us <br />FDOT D4 | SR-5/US-1 Transit improvements from Miami-Dade County Line to SR- <br />842/Broward Blvd, Broward County, FL (2017-2020)|Mrs. Liu served as Engineer of Record <br />and Project Manager.The project entailed transit improvements to bus shelters at 11 locations <br />EDUCATION <br />BS Civil Engineering <br />University of Miami, 1996 <br />YEARS OF EXPERIENCE <br />Total 30 years <br />2014 - Present – CALTRAN <br />REGISTRATIONS <br />ƒProfessional Engineer: <br />àFlorida No. 57565, 2001 <br />PROFICIENCIES <br />ƒProject Management <br />ƒTransportation Engineer <br />ƒPlanning <br />ƒMultimodal <br />ƒData Management <br />ƒData Collection <br />ƒGIS <br /> <br /> <br /> <br /> <br />