|
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 169
<br />CES CONSULTANTS, INC.
<br />CARLOS CORREA
<br />Senior Inspector
<br />Carlos Correa is a Senior Construction Inspector with 25 years of experience supporting transportation
<br />and infrastructure construction projects across Florida and Texas. His experience includes roadway
<br />reconstruction and widening, milling and resurfacing, drainage improvements, bridge substructure
<br />work, lighting and signalization installations, and utility coordination. He has served in key inspection
<br />roles on assignments for FDOT Districts 4 and 6, Miami-Dade County, Broward County, and municipal
<br />clients throughout South Florida. His responsibilities include inspection and documentation of
<br />contractor operations, verification of materials and installations, verification of pay quantities
<br />for contractor pay estimates, and ensuring compliance with Maintenance of Traffic plans, safety
<br />requirements, and contract documents. Carlos provides thorough documentation and field oversight
<br />that support efficient project delivery and construction compliance.
<br />PortMiami, Shore Power Project at Terminals A, B, F, V & MSC, Miami, FL: Senior Inspector. Performed
<br />construction administration and inspection services for installation of shore-side electrical power
<br />systems serving cruise ship terminals A (Royal Caribbean), B (Norwegian Cruise Line), F (Carnival),
<br />V (Virgin Voyages), and MSC.
<br />FDOT D6, SR5/S Dixie Hwy from North of Card Sound Rd to SW 304 St Improvements (FIN Nos.
<br />441827-1-52-01 & 441812-1-52-01), Miami-Dade County, FL: Senior Inspector. Performed sampling,
<br />testing, inspection, and documentation of contractor operations for roadway reconstruction along
<br />SR5/S Dixie Highway from north of Card Sound Road to SW 304 Street. Improvements included roadway
<br />reconstruction, milling and resurfacing, signing and pavement markings, new concrete sidewalks,
<br />signalization, lighting, tree removal and relocation, landscaping, and Intelligent Transportation
<br />Systems improvements. Conducted final inspections of roadway elements including pull boxes,
<br />concrete traffic railings, guardrails, and attenuators to verify compliance with contract documents.
<br />Prepared punch lists and tracked corrective work. Additional responsibilities included EEO compliance
<br />monitoring, coordination with utility agencies, field coordination, participation in progress meetings,
<br />Materials Acceptance and Certification System support, verification of pay quantities for contractor
<br />pay estimates, preparation of as-built documentation, and project closeout documentation.
<br />City of Fort Lauderdale, NE 13th Street from NE 4th Ave to NE 9th Ave Complete Streets Project
<br />(#19196), Fort Lauderdale, FL: Senior Inspector/Assistant Project Administrator. Performed
<br />inspection and documentation of contractor operations and verification of pay quantities for
<br />contractor pay estimates. The project improved NE 13th Street from NE 4th Avenue to NE 9th Avenue
<br />to enhance multimodal safety and accessibility through lane reductions, bicycle lanes, enhanced
<br />crosswalks, pedestrian-scale street lighting, on-street parking, landscaping, and ADA improvements.
<br />Construction activities included milling and resurfacing, lighting installation, ADA ramp construction,
<br />and bioswale installation. Cost: $1.3M.
<br />FDOT D4, Lyons Rd from Norte Lago to Pine Springs Dr Improvements (FIN #435101-1-52-01), Boca
<br />Raton, FL: Senior Inspector. Performed inspection and documentation of contractor operations and
<br />verification of pay quantities for contractor pay estimates. Improvements along Lyons Road south of
<br />Glades Road from Norte Lago to Pine Springs Drive included reconstruction of three horizontal curves
<br />to improve superelevation, milling and resurfacing, drainage improvements, signing and pavement
<br />markings, sidewalk and ADA curb ramp upgrades, and construction of a southbound right-turn lane
<br />from Lyons Road to Norte Lago. Cost: $3.5M.
<br />YEARS EXPERIENCE
<br />25
<br />EDUCATION
<br />BS, Civil Engineering Technology,
<br />Politecnico Colombiano Jaime Isava
<br />Cadavid, 1990
<br />TRAINEE ID
<br />4312
<br />CERTIFICATIONS & TRAINING
<br />CTQP Earthwork Construction
<br />Inspection, Level 1
<br />TROXLER Nuclear Training and
<br />Safety
<br />HAZMAT Training Certification
<br />FSESCI/FDEP Qualified Stormwater
<br />Management Inspector
<br />IMSA Traffic Signal Inspector
<br />Florida Intermediate Work
<br />Earthwork Records System
<br />Workshop Training Course
<br />AutoCAD Release 13 Training Course
|