|
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)17
<br />CES CONSULTANTS, INC.
<br />RFQ Scope Requirement CES Team Capability/Response Lead/Supporting Staff & Resources Supporting Experience/Page
<br />Construction solicitation
<br />documents, technical
<br />specifications,
<br />construction documents,
<br />bidding assistance
<br />and construction
<br />administration
<br />MEETS/EXCEEDS. CES supports the
<br />full project lifecycle and prepares
<br />coordinated plans, specifications, bid
<br />documents, estimates and permit
<br />packages; assists during procurement
<br />and bidding; responds to construction
<br />phase issues; and provides construction
<br />administration, engineering during
<br />construction, field observation and
<br />closeout support.
<br />Sergio Williams, PE; Jose Caraballo,
<br />PE; Jorge Zurita, CGC
<br />CES Professional Services,
<br />page 9; Sergio Williams, PE,
<br />page 114; Jose Caraballo,
<br />PE, page 113; Jorge Zurita,
<br />CGC, page 125; General Civil/
<br />Transportation Approach,
<br />pages 195–205
<br />Construction cost
<br />estimates
<br />MEETS/EXCEEDS. CES incorporates
<br />cost estimating throughout project
<br />development and provides independent
<br />estimating, cost control, constructability/
<br />value engineering review, change
<br />evaluation and project controls
<br />capabilities to support informed City
<br />decision-making.
<br />Manuel A. De La Cruz; Project
<br />Managers
<br />CES Professional Services,
<br />page 9; Staffing, pages 96–
<br />106; Cost Control, page 189;
<br />General Civil/Transportation
<br />Approach, pages 195–205
<br />General plan
<br />review; reports and
<br />recommendations for
<br />repair/replacement
<br />of City facilities; City
<br />representative functions
<br />MEETS. CES provides condition
<br />assessment, plan review, engineering
<br />evaluation and owner representative
<br />support. Jose Caraballo, PE, previously
<br />served in a temporary Interim Public
<br />Works Director role for the Village of
<br />Key Biscayne, where he performed
<br />plan reviews, assisted contractors and
<br />supported public outreach, providing
<br />directly applicable municipal experience.
<br />Jose Caraballo, PE; David Hoot, PE;
<br />CES Technical Advisors
<br />Key Personnel, pages 100–105;
<br />Jose Caraballo, PE, page 113;
<br />David Hoot, PE, page 116
<br />Computerized maps,
<br />records and GIS
<br />MEETS. CES provides GIS and geospatial
<br />support for infrastructure planning, design,
<br />asset information, utility coordination
<br />and project documentation, supported by
<br />dedicated GIS and CAD resources.
<br />Lindsay Cline; Mabel Villazon; CES
<br />Engineering Team
<br />CES Professional Services,
<br />page 9; General Civil
<br />Organizational Chart, page
<br />97; Mabel Villazon, page 123;
<br />Lindsay Cline, page 124
<br />Surveying and mapping,
<br />including metes and
<br />bounds, topography,
<br />elevation certificates
<br />and GPS data collection
<br />MEETS/EXCEEDS. Longitude provides
<br />surveying and mapping support and
<br />brings direct experience in Sunny Isles
<br />Beach, including survey assignments for
<br />the Government Center and Sunny Isles
<br />Water Main Improvements.
<br />Longitude; Eduardo M. Suarez, PSM
<br />General Civil Organizational
<br />Chart, page 97; Longitude,
<br />page 136
<br />Geotechnical
<br />consultation, testing,
<br />reports, on-site
<br />representation and
<br />evaluation of coastal
<br />geotechnical conditions
<br />MEETS. Terracon provides the CES Team
<br />with geotechnical and environmental
<br />capabilities for subsurface investigation,
<br />testing, reporting, regulatory
<br />coordination and project-specific
<br />geotechnical evaluation.
<br />Terracon; Rutugandha “Rutu” H.
<br />Nulkar, PE; Steven A. Harrison, PG
<br />General Civil Organizational
<br />Chart, page 97; Terracon,
<br />pages 138–139
|