Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)17 <br />CES CONSULTANTS, INC. <br />RFQ Scope Requirement CES Team Capability/Response Lead/Supporting Staff & Resources Supporting Experience/Page <br />Construction solicitation <br />documents, technical <br />specifications, <br />construction documents, <br />bidding assistance <br />and construction <br />administration <br />MEETS/EXCEEDS. CES supports the <br />full project lifecycle and prepares <br />coordinated plans, specifications, bid <br />documents, estimates and permit <br />packages; assists during procurement <br />and bidding; responds to construction <br />phase issues; and provides construction <br />administration, engineering during <br />construction, field observation and <br />closeout support. <br />Sergio Williams, PE; Jose Caraballo, <br />PE; Jorge Zurita, CGC <br />CES Professional Services, <br />page 9; Sergio Williams, PE, <br />page 114; Jose Caraballo, <br />PE, page 113; Jorge Zurita, <br />CGC, page 125; General Civil/ <br />Transportation Approach, <br />pages 195–205 <br />Construction cost <br />estimates <br />MEETS/EXCEEDS. CES incorporates <br />cost estimating throughout project <br />development and provides independent <br />estimating, cost control, constructability/ <br />value engineering review, change <br />evaluation and project controls <br />capabilities to support informed City <br />decision-making. <br />Manuel A. De La Cruz; Project <br />Managers <br />CES Professional Services, <br />page 9; Staffing, pages 96– <br />106; Cost Control, page 189; <br />General Civil/Transportation <br />Approach, pages 195–205 <br />General plan <br />review; reports and <br />recommendations for <br />repair/replacement <br />of City facilities; City <br />representative functions <br />MEETS. CES provides condition <br />assessment, plan review, engineering <br />evaluation and owner representative <br />support. Jose Caraballo, PE, previously <br />served in a temporary Interim Public <br />Works Director role for the Village of <br />Key Biscayne, where he performed <br />plan reviews, assisted contractors and <br />supported public outreach, providing <br />directly applicable municipal experience. <br />Jose Caraballo, PE; David Hoot, PE; <br />CES Technical Advisors <br />Key Personnel, pages 100–105; <br />Jose Caraballo, PE, page 113; <br />David Hoot, PE, page 116 <br />Computerized maps, <br />records and GIS <br />MEETS. CES provides GIS and geospatial <br />support for infrastructure planning, design, <br />asset information, utility coordination <br />and project documentation, supported by <br />dedicated GIS and CAD resources. <br />Lindsay Cline; Mabel Villazon; CES <br />Engineering Team <br />CES Professional Services, <br />page 9; General Civil <br />Organizational Chart, page <br />97; Mabel Villazon, page 123; <br />Lindsay Cline, page 124 <br />Surveying and mapping, <br />including metes and <br />bounds, topography, <br />elevation certificates <br />and GPS data collection <br />MEETS/EXCEEDS. Longitude provides <br />surveying and mapping support and <br />brings direct experience in Sunny Isles <br />Beach, including survey assignments for <br />the Government Center and Sunny Isles <br />Water Main Improvements. <br />Longitude; Eduardo M. Suarez, PSM <br />General Civil Organizational <br />Chart, page 97; Longitude, <br />page 136 <br />Geotechnical <br />consultation, testing, <br />reports, on-site <br />representation and <br />evaluation of coastal <br />geotechnical conditions <br />MEETS. Terracon provides the CES Team <br />with geotechnical and environmental <br />capabilities for subsurface investigation, <br />testing, reporting, regulatory <br />coordination and project-specific <br />geotechnical evaluation. <br />Terracon; Rutugandha “Rutu” H. <br />Nulkar, PE; Steven A. Harrison, PG <br />General Civil Organizational <br />Chart, page 97; Terracon, <br />pages 138–139