My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)43 <br />CES CONSULTANTS, INC. <br /> RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br /> Page 41 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />REFERENCE QUESTIONNAIRE <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Phone: ____________________________________________ <br />Email: ___________________________________________ <br />1. Q: Rate the firm’s success in providing their services as it relates to the project. <br />A: <br />2. Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br />3. Q: Would you use them again? <br />A: <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br />5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: <br />6. Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />CES Consultants, Inc. <br />City of Aventura <br />Jake C. Ozyman, PE Director of Public Works <br />305.466.8970 <br />____________________________________ <br />_____________________________________________________________________________________________________________________________________________________________________________ <br />ozymanj@cityofaventura.gov <br />7/22/2026 <br />CES Consultants delivered strong results on this project. Their work was accurate, timely, and aligned with the <br />scope throughout the duration of the assignment. <br /> Their staff was knowledgeable, easy to reach, and consistently engaged. Project leadership was responsive <br />whenever coordination was needed. <br />Yes. <br />CES showed a clear commitment to the project and assigned the appropriate resources to keep everything moving. <br />They were attentive to deadlines and stayed involved from start to finish. <br />Reporting was consistent, complete, and submitted on schedule. Their documentation met the requirements of the <br />agreement without issue. <br />CES Consultants maintained good communication and handled challenges effectively. They were a reliable partner <br />throughout the project. <br />(City of Aventura CSC TO: NE 191 Street System <br />Stormwater Drainage & Roadway Improvements)
The URL can be used to link to this page
Your browser does not support the video tag.