My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc. Bid Document (23)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CES Consultants, Inc
>
CES Consultants, Inc. Bid Document (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:40:45 PM
Creation date
8/31/2026 12:37:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 47 <br />CES CONSULTANTS, INC. <br />LOCATION <br />Davie, FL <br />OWNER <br />Town of Davie <br />COST <br />Fee Only <br />KEY FEATURES <br />Stormwater Drainage Systems <br />Data Collection <br />Permitting Criteria <br />Hydrologic and Hydraulic Surface <br />Water Model <br />StormWise (formerly ICPR4) <br />TOWN OF DAVIE DRAINAGE STUDY <br />The improvements were focused on resolving drainage issues along the following residential <br />road segments: <br /> »1,300 feet of SW 67th Terrace <br /> »1,250 feet of SW 72nd Avenue <br /> »1,300 feet of SW 73rd Terrace <br /> »1,300 feet of SW 74th Avenue <br />Three concepts or alternatives were developed and modeled for each street. The goal of each <br />concept was to identify cost-effective stormwater drainage systems to meet the Town’s current <br />Flood Protection Level of Service (FPLOS). Through a combination of modeling results and cost <br />estimates, individual concepts or combinations of concepts were applied to each street to resolve <br />their unique flooding issues to meet the FPLOS. <br />The scope of services included the following: <br /> »Task 1: Data Collection and Determination of South Florida Water Management District <br />Permitting Constraints <br /> »Task 2: Existing Conditions Hydrologic and Hydraulic Analysis <br /> »Task 3: Conceptual Stormwater Design Improvements <br /> »Task 4: Stormwater Design Report <br /> »Task 5: Quantity Evaluation and Opinion of Probable Construction Cost <br /> »Task 6: Meetings and Coordination
The URL can be used to link to this page
Your browser does not support the video tag.