Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 85 <br />CES CONSULTANTS, INC. <br />The project limits are from Brickell Key Drive to the end of Brickell Key Bridge, including the <br />eastern side seawall. Scope includes the removal of the epoxy layer overlay, deck repairs, removal <br />of sidewalk tiles and concrete restoration, sidewalks widening, replacement of expansion joints, <br />installing ADA plates on all sidewalk expansion joints, restoration of asphalt pavement at approach <br />slabs, restoration of spalled areas and injection and sealing of cracks, repair of damaged prestressed <br />beams, repair of bearing plates and anchor bolts, installation of pile jackets, and seawall repair <br />abutting the bridge. <br />CEI SERVICES FOR THE BRICKELL KEY BRIDGE REPAIRS <br />LOCATION <br />Miami, FL <br />OWNER <br />City of Miami <br />COST <br />$4.6M <br />KEY FEATURES <br />Construction Engineering & <br />Inspection Services (CEI)