My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CONEMCO ENGINEERING, INC. Bid Document (7)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CONEMCO ENGINEERING, INC
>
CONEMCO ENGINEERING, INC. Bid Document (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:43:38 PM
Creation date
8/31/2026 12:42:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />REFERENCES <br /> <br /> RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br /> Page 41 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br /> <br />REFERENCE QUESTIONNAIRE <br /> <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br /> <br />Giving reference for: (Firm) _______________________________________________________________ <br /> <br />Firm giving Reference: ____________________________________ _______________________________ <br />Phone: ____________________________________________ <br />Email: ___________________________________________ <br /> <br />1. Q: Rate the firm’s success in providing their services as it relates to the project. <br />A: <br /> <br />2. Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br /> <br />3. Q: Would you use them again? <br />A: <br /> <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br /> <br />5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: <br /> <br />6. Q: Is there anything else we should know, that we have not asked? <br />A: <br /> <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br /> <br />Name: _______________________________________ Title _____________________________________________ <br /> <br />Sign Name: __________________________________ Date: ___________________________________________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Conemco Engineering, Inc. <br />Miami-Dade County Department of Solid Waste Management-West Transfer Station Building #1 <br />Ravi.Kadambala@miamidade.gov <br />P. 305-514-6672 I C. 786- 473-4916 <br />The personnel demonstrated adequate competence and were reasonably accessible when needed. Communication and responsiveness were acceptable throughout the project. <br />Yes. Based on their performance, we would consider using Conemco Engineering, Inc. again for similar projects. <br />The firm showed a consistent level of commitment and provided the necessary time and personnel to complete the work. Their involvement met the expectations of the project scope. <br />The firm delivered the required reports and documentation in accordance with the agreement. Reporting dates and content were generally met without significant issues. <br />No additional concerns. The project proceeded as expected, and the firm’s overall performance was in line with typical industry standards. <br />Ravi Kadambala Division Director <br />8-6-2026 <br />Conemco Engineering, Inc. generally met the project requirements and provided services in line with expectations. Their overall performance was satisfactory.
The URL can be used to link to this page
Your browser does not support the video tag.