Laserfiche WebLink
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 110 <br />PROJECT EXPERIENCE <br />I N S P E C T O R <br />YEARS OF EXPERIENCE <br />CONTACT <br />CERTIFICATIONS <br />AVAILABILITY <br />90% <br />Alejandro Sablon has over four years of experience in the <br />South Florida construction industry, performing field <br />testing of construction materials including concrete, <br />grout, asphalt , soil, and aggregates. <br />ALEJANDRO SABLON <br />SR-7/US-441 Transit Corridor Improvements- Broward, <br />FL. <br />Engineering Technician – Performed field testing of <br />earthwork and asphalt for roadway widening, buffered <br />bicycle lanes, new sidewalks, signage and pavement <br />marking upgrades, and milling and resurfacing along <br />Prospect Road. <br />SR 93/I-75 Ramps at NW 138 Street- Broward, FL. <br />Engineering Technician – Performed field testing of <br />earthwork and asphalt for ramp widening at NW 138th <br />Street. <br />SR-5/US-1/Federal Hwy from Johnson St to SR- <br />822/Sheridan St- Broward, FL. <br />Inspector – Performed field testing of earthwork for <br />roadway improvements along SR-5/US-1/Federal <br />Highway, including milling and resurfacing, 4-foot bicycle <br />lanes, LED lighting upgrades, sidewalk and paver <br />replacements, and decorative stamped asphalt <br />crosswalks. <br />(786) 701-8639 <br />dma-ces.com <br />Tin: S14500096 <br />Augercast Pile <br />Inspection <br />CTQP Earthwork <br />Construction Inspection <br />- Level I <br />CTQP Asphalt Paving <br />Level I <br />CTQP Asphalt Paving - <br />Level 2 <br />Augercast Piles <br />Inspector <br />4+ <br />S.R. 5/U.S. 1/Long Key Bridge Rehabilitation Project <br />Inspector - Performed concrete materials testing <br />services for the Long Key Bridge rehabilitation project <br />along U.S. Route 1 / Overseas Highway (MM 64.0) in <br />Monroe County for FDOT. Provided quality control and <br />concrete testing services during the construction phase <br />to ensure compliance with FDOT standards. The project <br />has an estimated construction value of $4.7 million.