|
Calvin, Giordano & Associates, Inc.
<br /> A SAFEbuilt Company
<br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 17Jenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica Cano Pablo Chon Kan-Munoz, PE, PTOSalman Rathore, PELee RowbothamCarlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCEJulio Gonzalez, PEElizabeth Prida, PEOtto Letzelter, PE, SE, CFM, SI, BCACarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEJuan Carlos MarinMohammed HedarianLeonardo BozaLance RobinsonLuis RiveraJorge Cervantes, PEVickki Placide-PickardKenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert AdvisoryNational Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc.US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC (DMA)Requirement from Scope for Transportation/Transit/Traffic Engineering
<br />Consulting services, including reports, studies, coordination with community organizations,
<br />construction plans and specifications, estimating and project management.X X X X X X
<br />Expertise and experience in traffic engineering, transportation planning, street and highway
<br />design, traffic calming design, transit planning, traffic studies, general engineering, X X X X
<br />Coordination with Miami-Dade County Transit, Metropolitan Planning Organization (MPO),
<br />Miami-Dade County, Florida Department of Transportation X X X
<br />Planning capabilities X X
<br />Multimodal planning (complete streets, bicycle and pedestrian facilities, micromobility)X X X
<br />Corridor and subarea studies X X X
<br />Transportation demand management (TDM) strategies X X
<br />Parking demand and shared parking studies X X
<br />Curbside and right-of-way management (loading, valet, TNCs, deliveries)X
<br />School zone planning and Safe Routes to School X X
<br />EV infrastructure planning X X
<br />Data collection and analysis (traffic counts, origin-destination studies, big data sources)X X X
<br />Development of performance metrics and mobility plans X X
<br />Grant identification, application preparation, and benefit-cost analysis X X X X X X
<br />Public outreach, stakeholder engagement, and community coordination X X
<br />Preparation of plans, studies, reports, and policy recommendations X X X X X X
<br />Traffic impact studies and operational analyses X X X X
<br />Intersection analysis and control evaluations (signals, roundabouts, all-way stop warrants)X X X X
<br />Traffic signal timing, coordination, and optimization X X X
<br />Intelligent Transportation Systems (ITS) planning and design X
<br />Speed studies and traffic calming design X X X X
<br />Vision Zero/roadway safety action plans, signing, pavement marking, and roadway lighting
<br />plans X X X
<br />Maintenance of Traffic (MOT) plans, parking operations and utilization studies X X X X
<br />Construction plans, specifications, and cost estimates X X X X X X X X X X X X X X X X X X
<br />Project management, including scheduling, budgeting, and interagency coordination X X X X X X
<br />Transit feasibility studies and service planning, route planning, stop placement, and service
<br />optimization X
<br />First/last mile connectivity solutions X
<br />Shuttle and circulator system planning X
<br />Transit amenities planning (shelters, accessibility improvements)X X
<br />Ridership analysis and forecasting X
<br />Integration of transit with land use and development patterns X
<br />Evaluation of emerging mobility options (microtransit, on-demand services)X
<br />Transit funding strategies and grant support X X
|