My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br /> A SAFEbuilt Company <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 25 <br />Stormwater 42 Year CDBG <br />CRA Parking Lot 203 NE 3rd Street <br />SW Quadrant Drainage Improvements <br />Three Islands Reuse Water Pipeline <br />City of Hallandale Beach Professional Services (Ongoing) <br />630 NW 2nd Street <br />Hallandale Beach, FL 33009 <br />Contact Information <br />Manga Ebbe <br />Project Manager <br />Tel No.: 954.597.3700 <br />Email: MEbbe@hallandalebeachfl.gov <br />CGA has provided continuing professional services to the City of <br />Hallandale Beach since 2009. Services have spanned multiple <br />City departments, including: <br />• Assistance to the planning department for: review of site <br />plans, traffic impact analysis reports, sewer capacity <br />evaluations <br />• Project contracts with the public works department for: <br />stormwater, water, sewer, and reuse water designs <br />• Assistance to the building department as-needed for plan <br />review <br />Contract Amount: <br />Multiple Contracts - specific contract information available upon <br />further request from the City. <br />Projects completed for the City include: <br />• NE Quadrant Drainage Improvements (HMGP) <br />• Boundary Surveys <br />• Medical Center Traffic Reviews <br />• Icebox Culinary Center Traffic Reviews <br />• SW Drainage Improvements (FEMA HMGP) <br />• Three Islands Reuse Water Pipeline <br />• Raw Water Pipeline <br />• Hallandale Beach Regional Activity Center (RAC) <br />• Hallandale Beach Stormwater 42 Year CDBG <br />• Hallandale Beach Stormwater 47 Year CDBG <br />• CRA Sustainable Parking
The URL can be used to link to this page
Your browser does not support the video tag.